My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00714
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00714
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:53:28 PM
Creation date
10/4/2006 6:43:16 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/9/1975
Description
Agenda or Table of Contents, Minutes, Resolution
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Savery-Pot Hook Proj~ <br /> <br />A. Recently the Fish and Wildlife Serviee haVe ihdi~Ated that <br />considerable more wildlife information is available in Wyoming <br />and Colorado. During recent meetings with wildlife resource <br />staff members from both states, Colorado personnel have indi- <br />cated that irrigation of the 11,000 acres of full service <br />lands would severely impact the antelope and grouse resource. <br />Meetings are scheduled this week to explore possible mitigation <br />measures. <br /> <br />B. We have been requested to include the new wildlife data in <br />our draft environment statement. We have requested the Fish <br />and Wildlife Service to provide us this data by July 15, 1975. <br /> <br />C. Negotiations have been completed for aerial topographic <br />coverage of the project reservoir basins. <br /> <br />D. We envision subsequent contracts which will allow precon- <br />struction data gathering to proceed. <br /> <br />Colorado River Basin Salinity Control Project <br /> <br />A. Grand Valley Unit <br /> <br />1. A contract was negotiated in March 1975 to obtain aerial <br />topography, orthophoto maps, and cross sections of the <br />Grand Valley area. Value of contract - $240,009. <br /> <br />2. A contract was awarded ($46,300) in April 1975 for <br />drilling exploratory holes along large canals in the proj- <br />ect area. This will provide geologic information for <br />use in canal lining designs. In addition, it will pro- <br />vide data for the ongoing cooperative study by the <br />Agricultural Research Service in the Peck and Bede Wash <br />study area. In this area the gross inflow-outflow can <br />be isolated to determine salt pick-up and the effect <br />lining of canals and laterals will have on the salt pickup. <br /> <br />B. Paradox Valley Unit <br /> <br />1. Several contracts have been awarded to provide basic data <br />for the advance planning studies. These are: <br /> <br />a. Foundation drilling - Raditun Dam <br /> <br />b. Drilling and installing 27 peizometers <br /> <br />c. Drilling 3 exploratory wells <br /> <br />d. Archeological and historical surveys <br /> <br />e. Environmental studies, including wildlife and <br />fauna inventories. <br /> <br />-8- <br /> <br />I <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.