<br />J/O.,) <br /> <br />We have been taking soundings on the <br />reservoir through the ice to determine its <br />exact capacity for use in the negotiations <br />with the C. F. & I. <br /> <br />I <br /> <br />The route location for the relocated <br />railroad around Pueblo Reservoir has been <br />started and field surveys are in process on <br />that. <br /> <br />The Southeastern Colorado Water Conser- <br />vancy District has requested, on February <br />13th, that we prepare and present to them a <br />draft of our proposed repayment contract. <br />They expect to consider that at their regular <br />meeting tomorrow, March 12th. <br /> <br />We also have, as I mentioned, done some <br />work on the proposed negotiations with the <br />Colorado Fuel and Iron Corporation on Turquoise <br />Lake. <br /> <br />We are continuing the work on the hydro- <br />logic operations of the Fryingpan-Arkansas <br />Project on the computer. We are running those <br />operations for the project itself and also for <br />the Homestake Project. When we get satisfac- <br />tory results on the runs of each project inde- <br />pendently then we will start runs on the <br />combination of the two. We hope that we will <br />be in a position to get a combined run in the <br />very near future; probably within the next <br />week or ten days. <br /> <br />We are also, of course, studying the <br />power markets for the Fry-Ark power and the <br />integration of that power into the intercon- <br />nected systems of the Western Division. <br /> <br />I <br /> <br />We opened a laboratory at Salida on <br />November 12th and are installing the equipment <br />and getting ready to operate that laboratory <br />during the construction of the project as a <br />whole. <br /> <br />We are also about to open a construction <br />office at Glenwood Springs. The exact location <br />