My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00639
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00639
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:52:44 PM
Creation date
10/4/2006 6:42:04 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/11/1964
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Essentially all of the material has been <br />placed in Zone 3 of the dam and the contrac- <br />tor is doing some work on the lining of the <br />spillway tunnels and outlet tunnels. <br /> <br />I <br /> <br />The diversion tunnel at Morrow Point Dam <br />was holed through on January 20th, and prepara- <br />tions are under way for placing a lining in <br />that tunnel. This lining is of a temporary <br />type as the tunnel will not be used after the <br />dam is finished. The open cut excavation for <br />the dam foundation and powerplant is continu- <br />ing. The access road, both to the crest and <br />to the powerplant,is well under way. <br /> <br />Also, most of the highway work is either <br />completed or under construction relocating <br />Highway 50 around Blue Mesa Reservoir. I <br />haven't been there recently but I understand <br />that the Colorado Department of Highways is <br />to award the fourth schedule on Highway 50. <br />They may have done it in the last four or five <br />days. <br /> <br />I <br /> <br />Now just a few items on our Transmission <br />Division. On an overall basis it is progress- <br />ing just about on schedule. The l38-kv line <br />from Flaming Gorge to Green Mountain is com- <br />pleted. However, that line is in service only <br />between Flaming Gorge and Vernal. This is due <br />to some delay in the securing of equipment at <br />Moon Lake-Rangely substation. Also at the Mt. <br />Harris substation. This is principally equip- <br />ment that the Colorado-Ute is to place in <br />those installations. The l15-kv line is com- <br />pleted between Salida and Montrose. The Glen <br />Canyon-Shiprock, Shiprock-Curecanti, and <br />Curecanti-Hayden lines are scheduled for com- <br />pletion this summer. The Pinnacle Peak-Mesa <br />transmission line is expected to be ready for <br />service by this spring. <br /> <br />We are encountering some delay on the <br />Glen Canyon-Pinnacle Peak lines. However, we <br />expect those will also be completed by late <br />summer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.