My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00639
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00639
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:52:44 PM
Creation date
10/4/2006 6:42:04 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/11/1964
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />3786 <br /> <br />the problems we have there for later settle- <br />ment but we are going to complete the report <br />and issue it. <br /> <br />The Green Mountain Afterbay report is <br />being reviewed in the Regional Office and we <br />find there that it is not justified to continue <br />with feasibility investigations at this time. <br />We think that perhaps in two years when other <br />matters have been more clearly settled on the <br />upper part of ~he river and the power situa- <br />tion, as far as "marketing of peaking power, <br />and so forth, that we may be warranted to <br />reopen those investigations at that time. At <br />the present time it doesn't appear that we <br />should spend any more ,time or money on it. <br /> <br />I <br /> <br />On the Upper South Platte Unit, which <br />covers all of the Upper South platte Basin <br />from the confluence of the Cache la poudre <br />and the South Platte River, we are making <br />pretty good progress there. That study, as <br />you know. is being done with state money and <br />we will have a report out on that in June. <br />We are concentrating our efforts. of course, <br />on the Two Forks Pam and Reservoir, Powerplant <br />and Afterbay, and we will have an inventory <br />discussion in the report of tributary develop- <br />ments that might be taken into account also, <br />and a reconnaissance looksee at the terminal <br />reservoir below Denver, not the Narrows <br />Reservoir but one in between which might work <br />into that very well. <br /> <br />,We,have selected the sites of the '!'wo <br />Forks Reservoir and Afterbay for actual prelim- <br />inary designs and estimates and dam cost deter- <br />mi~ations on those two features. <br /> <br />The hydrologic studies are about completed <br />for the whole report and we are working on the <br />~ptimum size determination of the reservoir <br />i~self. We are also completing the work on <br />the costs of right-of-way for the Two Forks <br />Reservoir to be included in the total overall <br />cost. <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.