My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting 03/17/1980
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
Board Meeting 03/17/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:52:41 PM
Creation date
10/4/2006 6:41:59 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/17/1980
Description
Agenda and Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,~ <br /> <br />in July. One shoe remaining in the project is mitigation of cul- <br /> <br />tural resource damage. A request to Congress would increase the <br /> <br />l% limitation on cultural resource investigation to 4% on the <br /> <br />Dolores and Animas-La Paata,projects. <br />~~ <br />The Grand Valley Sal~ndi control project shows progeess in <br /> <br />the form of an operating and maintenance agreement with the Grand <br /> <br />Valley Water Users Association. <br /> <br />Paradox Valley project is in construction status while actual <br /> <br />work is yet go begin. Two alternatives are being considered. The <br /> <br />overland ditch small loan project is in the design stage with <br /> <br />construction antifipated next spring. <br /> <br />The Animas-La Plata project is in advanced planning status. <br /> <br />No funds for construction are included in the 81 budget. The service <br /> <br />has indicated that it has a construction start capability for <br /> <br />fiscal 8l of 2.8 million doll&s. One issue in the project is the <br /> <br />establishment of a new water conservancy district to include the <br /> <br />entire project area. <br /> <br />The West Divide project is in the definite plan or advanced <br /> <br />planning status. The feasibility designs and estimates are being <br /> <br />prepared, and a draft e.i.s. should be completed by mid-l980. <br /> <br />The San Miguel is also in advanced planning. Some alternatives <br /> <br />are being considered because project justification has become dif- <br /> <br />ficult. <br /> <br />The Dominguez Reservoir is in the feasibility stage and not <br /> <br />yet authorized. One issue in the project is potential XXHBLM wild- <br /> <br />erness at the reservoir site. <br /> <br />The Grand Mesa project is in feasibility status and not yet <br />
The URL can be used to link to this page
Your browser does not support the video tag.