Laserfiche WebLink
<br />,~ <br /> <br />in July. One shoe remaining in the project is mitigation of cul- <br /> <br />tural resource damage. A request to Congress would increase the <br /> <br />l% limitation on cultural resource investigation to 4% on the <br /> <br />Dolores and Animas-La Paata,projects. <br />~~ <br />The Grand Valley Sal~ndi control project shows progeess in <br /> <br />the form of an operating and maintenance agreement with the Grand <br /> <br />Valley Water Users Association. <br /> <br />Paradox Valley project is in construction status while actual <br /> <br />work is yet go begin. Two alternatives are being considered. The <br /> <br />overland ditch small loan project is in the design stage with <br /> <br />construction antifipated next spring. <br /> <br />The Animas-La Plata project is in advanced planning status. <br /> <br />No funds for construction are included in the 81 budget. The service <br /> <br />has indicated that it has a construction start capability for <br /> <br />fiscal 8l of 2.8 million doll&s. One issue in the project is the <br /> <br />establishment of a new water conservancy district to include the <br /> <br />entire project area. <br /> <br />The West Divide project is in the definite plan or advanced <br /> <br />planning status. The feasibility designs and estimates are being <br /> <br />prepared, and a draft e.i.s. should be completed by mid-l980. <br /> <br />The San Miguel is also in advanced planning. Some alternatives <br /> <br />are being considered because project justification has become dif- <br /> <br />ficult. <br /> <br />The Dominguez Reservoir is in the feasibility stage and not <br /> <br />yet authorized. One issue in the project is potential XXHBLM wild- <br /> <br />erness at the reservoir site. <br /> <br />The Grand Mesa project is in feasibility status and not yet <br />