My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00558
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00558
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:51:57 PM
Creation date
10/4/2006 6:40:34 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/27/1999
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />San Luis Valley Canal Comoanv - Diversion Structure Rehabilitation <br /> <br />Authorization: SB 97-008 <br />Water Source: Rio Grande River <br />Terms of Loan: $188,000@3.75%for30years <br /> <br />County: Rio Grande - E of Monte Vista <br />Project Yield: 25,000 ac.ft. <br />Project Type: Diversion Structure Rehab. <br /> <br />This project is the rehabilitation of the San Luis Valley Canal Company's Rio Grande River <br />diversion structure. The project is located in Rio Grande County, 3 miles east of Monte Vista The <br />AIamosa office of the Natural Resource Conservation Service has prepared the design plans with the <br />CWCB staff preparing the construction contract documents. Due to Wlexpected expenditures in 1998, <br />the Company has postponed construction of the project until the sunnner and full of 1999. <br /> <br />Highland Ditch Comoanv - Foothills Reservoir Dam Rehabilitation <br /> <br />Authorization: SB 98-1198 - Severence Tax <br />Water Source: St. VrainRiver <br />Terms of Loan: $1,040,000 @4.0"Iofor30years <br /> <br />County: Boulder - W ofLongmont <br />Project Yield: 450 ac.ft. <br />Project Type: Dam Rehabilitation <br /> <br />This project is the rehabilitation of Foothills Reservoir dam, located west of Longmont in <br />Boulder County. The dam has an inadequate spillway and severe seepage through the embankment <br />and has had a storage restriction placed on it by the State Engineer. The Highland Ditch Company has <br />contracted with Smith Geotechnical Engineering Consultants of Fort Collins to analyze design <br />alternatives and complete construction plans and specifications. Construction is scheduled to <br />commence in the full of1999. <br /> <br />Wood Lake Mutual Water & Irrigation Comoanv ~ Wood Lake Dam Rehabilitation <br /> <br />Authorization: SB 97-008 <br />Water Source: Cache ]a Poudre River <br />Terms of Loan: $188,000 @3.75%for30years <br /> <br />County: Weld - W of Eaton <br />Project Yield: 3,106 ac.ft. <br />Project Type: Dam Rehabilitation <br /> <br />This project is the replacement of the Wood Lake Dam outlet works including all control <br />structures, installation of a toe drain, raising the existing saddle dam, and construction of a spillway to <br />pass the 50"10 Probable Maximum Precipitation flood. The need fur the improvements is a resuh of the <br />State Engineer's Office dam safety requirements. Smith Geotechnical, Inc. of Fort Collins commenced <br />design in late spring 1998. Construction is scheduled for early spring and sunnner of 1999. <br />
The URL can be used to link to this page
Your browser does not support the video tag.