My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00558
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00558
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:51:57 PM
Creation date
10/4/2006 6:40:34 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/27/1999
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />.. <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />Western Mutual Ditch Conmanv - Check Darn Rehabilitation <br /> <br />Authorization: 1998 Small Project Loan Account <br />Water Source: South Platte River <br />Terms of Loan: $loo,000@3.7S%for20years <br /> <br />County: Weld - NW ofPlatteville <br />Project Yield: 20,000 ac.ft. <br />Project Type: Check Darn Rehabilitation <br /> <br />This project is the rehabilitation of the Western Mutual Ditch Company's South Platte River <br />check dam across the river from their diversion structure. The check dam creates a backwater along a <br />river side-channel created by an island on the south side of the river, and diverts the flow to the <br />Company's diversion structure on the north side of the river. The project is located in Weld County, 2 <br />miles northwest of PIatteville. Rocky Mountain Consuhants of Longmont has prepared the design <br />plans and construction contract documents. Construction is scheduled to connnence in early 1999, <br />depending upon receipt of access approvals, and will be completed in 1999. <br /> <br />Greelev and Loveland Irrigation Company - Horseshoe Darn #2 Outlet Rehabilitation <br /> <br />Authorization: Small Project Loan Accolmt <br />Water Source: Big Thompson River <br />Terms of Loan: $75,000 @4.2I% for 30 yrs. <br /> <br />County: Larimer - NE of Loveland <br />Project Yield: 8,051 ac.ft. <br />Project Type: Darn Outlet Rehabilitation <br /> <br />This project is the rehabilitation of the Horseshoe Darn #2 outlet structure, located just <br />northeast of Loveland in Larimer County. The outlet became inoperable in May 1998 and has been <br />temporarily blocked shut since then. The Greeley and Loveland Irrigation Company has contracted <br />with Boyle Engineering Corporation of Lakewood to analyze design alternatives and complete <br />construction plans and specifications. Construction is scheduled to commence in the early spring of <br />1999 with completion scheduled for the late spring of 1999. <br /> <br />Boulder & Lefthand Irrigation Company - Twin Lakes Outlet Imorovements <br /> <br />Authorization: 1998 Small Project Loan Accolmt Colmty: Boulder - NE of Boulder <br />Water Source: Boulder Creek Project Yield: 218 ac.ft. <br />Terms of Loan: $50,000 @3.7S% for 15 yearsProject Type: Darn Outlet Improvements <br /> <br />This project is the reconstruction of the Boulder & Lefthand Irrigation Company reservoir's <br />(Twin Lakes) outlet and inlet structures. Recent State Engineer Office inspections indicate that the <br />outlet conduit has rusted through and is functionally obsolete. Rocky Mountain Consuhants of <br />Longmont are currently preparing the improvement design with construction scheduled for 1999. <br />
The URL can be used to link to this page
Your browser does not support the video tag.