Laserfiche WebLink
<br />Proiects Under Desh!:n <br /> <br />. <br /> <br />. <br /> <br />e <br /> <br />Julesburg Irrigation District - Harmonv Ditch # 1 Diversion Structure Rehabilitation <br /> <br />Authorization: Emergency Infrastructure Repair Ace. <br />Water Source: South Platte River <br />Terms of Loan: $590,000 @ 3.75% fur 30 years <br /> <br />County: Logan - SW of Crook <br />Project Yield: 40,000 ac.ft. <br />Project Type: Diversion Rehabilitation <br /> <br />This project is the emergency rehabilitation of the Julesburg Irrigation District's Harmony <br />Ditch #1 diversion structure on the South Platte River 4 miles southwest of Crook. The structure was <br />damaged by the 1997 South Platte floods and is critic8J. to the operation of the Company's Julesburg <br />Reservoir. Zoyiopoulos & Associates of Greeley is preparing the design plans for a late January 1999 <br />construction start. Construction is scheduled for completion by late March 1999. <br /> <br />North Poudre Irril!ation Conmanv - Various Pioeline and Dam Tmpmvements <br /> <br />Authorization: SB 98-1189 <br />Water Source: Cache Ia Poudre <br />Terms of Loan: $500,000 @4.03% for 20 years <br /> <br />County: Larimer - W of Wellington <br />Project Yield: 11,973 ac.ft. <br />Project Type: Dam and Pipeline Rehab. <br /> <br />e <br /> <br />This project is the rehabilitation of several North Poudre system fucilities. The rehabilitation <br />projects include: 1,) Spillway construction at North Poudre Reservoir #5. 2.) Pipeline construction at <br />the North Poudre Reservoir #6 outlet. 3.) Pipeline construction along North Poudre's Buckeye lateral <br />Smith Geotechnical, Inc. of Fort Collins is currently preparing the design plans with construction <br />scheduled for the spring of 1999 on the Reservoir #6 project. Future construction schedules have not <br />yet been determined. <br /> <br />Summit Reservoir and Irrigation CoIl!JlllllY - Summit Reservoir and Ditch System Rehab. <br /> <br />Authorization: SB 97-008 <br />Water Source: Lost Canyon Creek <br />Terms of Loan: $200,000 @3.7S%fur30years <br /> <br />County: Montezuma - NE of Cortez <br />Project Yield: 4,287 ac.ft. <br />Project Type: Reservoir and Ditch Rehab. <br /> <br />This project is the rehabilitation of the Summit Reservoir Dam outlet works and the <br />construction of repairs and improvements to the Summit Reservoir and Irrigation Company's water _ <br />collection and distnbution fuci1ities. The Cortez office of the Natural Resource Conservation Service is _ <br />preparing the construction plans and specifications with construction scheduled for the winter and <br />spring of1999. <br />