My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00558
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00558
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:51:57 PM
Creation date
10/4/2006 6:40:34 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/27/1999
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />t <br /> <br />.. <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />Greelev and Loveland Irrigation CoIllpllltY - Eaualizer Dam Rehabilitation <br /> <br />Authorization: SB 98-1189 <br />Water Source: Big Thompson River <br />Terms of Loan: $308,000 @4.21%for30years <br /> <br />County: Larimer - E of Loveland <br />Project Yield: 885 ac.ft. <br />Project Type: Dam Rehabilitation <br /> <br />This project is the rehabilitation of the Greeley & Loveland Irrigation Company's Equalizer <br />Reservoir located east of Loveland. The project includes replacement of the dam outlet gate with a <br />new structure, which will incorporate both the outlet gate and a spillway. The existing dam <br />embankment will also be raised almost four feet. Eel Consultants, Inc. of Englewood prepared the <br />construction plans and specifications with the construction contract recently awarded to Schrnuesor <br />and Associates, Inc. of Wheatridge, CO. Construction commenced November 16, 1998 with <br />completion scheduled for the spring of 1999. The project is currently 25% complete. <br /> <br />Pinon Mesa Ranches Communitv Association - Rural Raw Water SYStem Construction <br /> <br />Authorization: SB 97-008 <br />Water Source: Florida River <br />Terms of Loan: $2S8,000@3.75% for 30 yrs <br /> <br />County: La Plata - W ofIgnacio <br />Project Yield: 125 ac.ft. <br />Project Type: Diversion and Dist. System <br /> <br />This $345,000 project is the construction of a new rural raw water irrigation and distnbution <br />system in La Plata County west of Ignacio. The project consists of construction of a concrete <br />diversion structure and pump station at the Florida River, a transmission pipeline from the diversion to <br />a storage impoundment, and construction of approximately 9,000 fuet of distnbution pipeline from the <br />storage impoundment to the water users. RMI Environmental Services of Farmington, New Mexico <br />prepared the project design. Project construction commenced September 2, 1997 by RMI <br />Environmental Services of Farmington, New Mexico (a design/build contractor). The project is <br />currently 70% complete and continues to be on indefinite hold due to and financial problems. <br /> <br />Fort Morgan. City of - NCWCD Southern Pioeline Extension <br /> <br />Authorization: SB94-029, SB98-1189, Svrnce Tax County: WeldIMorgan - W ofFt. Morgan <br />Water Source: Colo.-Big ThompsonIWindy Gap Project Yield: 6,877 ac.ft. <br />Terms of Loan: $5,500,000 @4% for 40 yearsProject Type: Pipeline Construction <br />$8,000,000 @ 4% fur 30 years <br /> <br />This project is an extension of the Northern Colorado Water Conservancy District's Southern <br />Pipeline Project. The pipeline extension will provide high quality western slope water to the City of <br />Fort Morgan for their municipal use. Montgomery Watson, Inc. of Denver completed the project <br />design, from the Hudson/Ft. Lupton extension at Platteville, to the Fort Morgan area, in June. The <br />construction contract was awarded to BRB Contractors, Inc. of Topeka, Kansas and construction <br />commenced September 1, 1998. Project completion is scheduled fur late 1999. <br />
The URL can be used to link to this page
Your browser does not support the video tag.