My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00531
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00531
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:51:34 PM
Creation date
10/4/2006 6:40:00 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/7/1969
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />U..J..JU <br /> <br />Included in this report will be recommend- <br />ations for some work on Cherry Creek. At <br />Cherry Creek Dam we would propose to raise <br />the spillway so that it would no longer flow <br />into TOll Gate Creek in case the water in <br />Cherry Creek were enough to make the spillway <br />flow. It never has but it certainly could. I <br />This would require, in order to store a proba- . <br />ble maximum flood in the Cherry Creek basin, <br />that we would have to get some additional <br />storage besides that that is available in <br />Cherry Creek, even with the spillway raised <br />some 42 feet. We would have to do this and <br />we would propose to do this at the Castlewood <br />site which is upstream. This will be in the <br />Sand-Toll Gate report which, I repeat, is <br />coming out about the first of July. It will <br />go forward to our higher authority at that <br />time. <br /> <br />On Bijou Creek we have a study under <br />way which we expect to complete about Decem- <br />ber 1969. This report we have speeded up in <br />order to fit in with the plans of the Bureau <br />of Reclamation for the Narrows Project that <br />they have in the immediate area. <br /> <br />We have done some flood plain information <br />studies. The most recent one was given to <br />the people in Boulder County on Left Hand <br />Creek which should be appropriate today be- <br />cause some of the people here told me there <br />is some high water on that particular stream <br />as well as Boulder Creek, up in that region. <br />That was in February of this year. We are <br />continuing with studies on Boulder Creek and <br />South Boulder Creek. These are flood plain <br />information studies which do not offer flood <br />control plans but try to show the people in <br />those areas where their flood problems really <br />are with regard to their streams. <br /> <br />On Chatfield Dam we have just completed <br />the Stage II earthwork. Mr. Sparks referred <br />to chatfield. We are working as rapidly as <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.