Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />North Poudre Irrigation Company - V miOllS Pineline and Dam Imnrovements <br /> <br />Authorization: SB 98-1189 <br />VVm~Somce:C~helaPoudre <br />Terms of Loan: $500,000 @ 4,03% for 20 years <br /> <br />County: Larim~- VV ofVVellington <br />Project Yield: 11,973 ~.ft, <br />Project Type: Dam and Pipeline Rehab, <br /> <br />This project is the rehabilitation of several North Poudre system f~ilities. The <br />rehabilitation projects include: 1.) Spillway construction at North Poudre Reservoir #5, 2,) Pipeline <br />construction at the North Poudre Reservoir #6 outlet. 3,) Pipeline construction along North <br />Poudre's Buckeye Imeral, Smith Geotechnical, Inc, of Fort Collins is currently preparing the <br />design plans with construction scheduled for the fall of 1998 on the Reservoir #6 project. Future <br />construction schedules have not yet been determined, <br /> <br />Julesbmg Irrigation District - Harmonv Ditch # 1 Diversion Structure Rehabilitation <br /> <br />Authorization: Emergency Infrastructure Repair Acc, County: Logan - SVV of Crook <br />VVater Somce: South Platte River Project Yield: 40,000 ac,ft. <br />Terms of Loan: $590,000 @ 3,75% for 30 years Project Type: Diversion Rehabilitation <br /> <br />This project is the emergency rehabilitation of the Julesbmg Irrigation District's Harmony <br />Ditch #1 diversion structure on the South Platte River 4 miles southwest of Crook. The structure <br />was damaged by the 1997 South Platte floods and is critical to the operation of the Company's <br />Julesbmg Reservoir, Zoyiopoulos & Associates of Greeley is preparing the design plans for an <br />October 1998 construction start, Construction is scheduled for completion by late March 1999, <br /> <br />Boulder & Lefthand Irrigation Comnanv - Twin Lakes Outlet Improvements <br /> <br />Authorization: 1998 Small Project Loan Account <br />VVater Somce: Boulder Creek <br />Terms of Loan: $50,000 @ 3,75% for 15 years <br /> <br />County: Boulder - NE of Boulder <br />Project Yield: 218 ac.ft, <br />Project Type: Dam Outlet Improvements <br /> <br />This project is the reconstruction of the Boulder & Lefthand Irrigation Company reservoir's <br />(Twin Lakes) outlet and inlet structures. Recent State Engine~ Office inspections indicate that the <br />outlet conduit has rusted through and is functionally obsolete, Rocky Mountain Consultants of <br />Longmont are currently preparing the improvement design with construction scheduled for the fall <br />of 1998, <br />