My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00460
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00460
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:50:26 PM
Creation date
10/4/2006 6:38:29 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/13/1998
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />e <br /> <br />. <br /> <br />Chipperfield Lane Ditch Company - Chipoerfield Lane Headgate and Pipeline Rehabilitation <br /> <br />Authorization: Small Project Loan Account <br />Water Source: Dry Hollow Creek <br />Terms of Loan: $60,000 @ 3,7S% for 30 yrs <br /> <br />County: Garfield - S of Silt <br />Project Yield: 220 ac,ft, <br />Project Type: Headgate and Pipeline <br /> <br />This $80,000 project is the construction of 10,000 feet of pipeline replacing an existing <br />open ditch in poor condition, The project also consists of reconstruction of the existing inlet <br />structure at the Multa Trina Ditch, The Glenwood Springs office of the Natural Resources <br />Conservation Service prepared project design, Project construction commenced November I, 1997 <br />by the Ditch Company's own forces, The project was completed in May 1998, Project <br />documentation and final accounting is currently underway with substantial completion scheduled in <br />July 1998, <br /> <br />Farmers Pawnee Canal Companv- Diversion Structure Rehabilitation <br /> <br />Authorization: 1998 Small Project Loan Account <br />Water Source: South Platte River <br />Terms of Loan: $29,000 @3,S%for 10 years <br /> <br />County: Logan - SW of Merino <br />Project Yield: 28,000 ac,ft, <br />Project Type: Diversion Structure Rehab, <br /> <br />This project is the rehabilitation of the Company's diversion and headgate structure on the <br />South Platte River, The project includes the insta1lation of sheet piling and concrete placement and <br />patching. The project restores damage caused by the July 1997 Pawnee Creek flood and protects <br />the benefit of irrigation water to about 10,000 acres of cropland, The project was designed by the <br />Natural Resource Conservation District, Sterling office and was constructed by R&R International, <br />Inc, of Denver, Construction commenced March 16, 1998 and was completed April IS, 1998, <br />Project documentation and final accounting is currently underway with substantial completion <br />scheduled in July 1998. <br /> <br />Wamslev Cattle Company - Pole Mountain Dam <br /> <br />Authorization: HB 93-1273 <br />Water Source: Off-Stream Drainage <br />Terms of Loan: $4S,000 @ 3% for 40 years <br /> <br />County: Jackson - SW of Walden <br />Project Yield: 1,90S ac,ft, <br />Project Type: Dam Rehabilitation <br /> <br />This dam rehabilitation project commenced in March 1994 by the owners of the Wamsley <br />Cattle Company. The project consists of replacing the reservoir's outlet structure and improving the <br />dam's upstream slope, The remaining work includes placement of the upstream face riprap and <br />insta1lation of the outlet gate. The project has been re- scheduled for completion in 1998, <br />
The URL can be used to link to this page
Your browser does not support the video tag.