Laserfiche WebLink
<br />Pinon Mesa Ranches Community Association - Rural Raw Water Svstem Construction <br /> <br />Authorization: SB 97.008 <br />Water Source: Florida River <br />Terms of Loan: $258,000 @ 3,75% for 30 yrs <br /> <br />County: La Plata - W ofIgnacio <br />Project Yield: 125 ac,ft, <br />Project Type: Diversion and Dist. System <br /> <br />. <br /> <br />This $345,000 project is the construction of a new rural raw water irrigation and distribution <br />system in La Plata County west of Ignacio. The project consists of construction of a concrete <br />diversion structure and pump station at the Florida River, a transmission pipeline from the diversion <br />to a storage impoundment, and construction of approximately 9,000 feet of distribution pipeline <br />from the storage impoundment to the water users, RMI Environmental Services of Farmington, <br />New Mexico prepared the project design. Project construction commenced September 2, 1997 by <br />RMI Environmental Services of Farmington, New Mexico (a design/build contractor), The project <br />is currently 70% complete and is being re-scheduled for an October 1998 completion due to right- <br />of-way, permitting, and financial delays, <br /> <br />Durkee Ditch ComDanv - Rehabilitation of the Durkee Ditch <br /> <br />Authorization: SB 97.008 <br />Water Source: Currant Creek <br />Terms of Loan: $120,000 @ 3,75% for 30 yrs <br /> <br />County: Delta- E of Orchard City <br />Project Yield: 2,000 ac,ft, <br />Project Type: Headgate and Pipeline <br /> <br />This $343,000 project is the construction of a new concrete headgate and turnouts, and <br />construction of approximately 13,000 feet ofPVC pipeline replacing an open channel ditch ir, Delta <br />County northeast of Delta, Colorado, The Delta and Grand Junction Office of the Natural Resource <br />Conservation Service prepared project design. Project construction commenced September ~, 1997 <br />by K C Equipment and Consulting of Delta, Colorado, Phase I of the project was completed in <br />December 1997 with the final Phase II scheduled for completion in October 1998, The project is <br />currently 50% complete, <br /> <br />. <br /> <br />Agricultural Ditch and Reservoir ComDanv . Rehabilitation of the Welch Ditch <br /> <br />Authorization: SB 97.008 <br />Water Source: Clear Creek <br />Terms of Loan: $300,000 @ 5.25% for 30 yrs <br /> <br />County: Jefferson - NW Lakewood <br />Project Yield: 1,000 ac,ft, <br />Project Type: Pipeline and Pumps <br /> <br />This $600,000 project involves the abandonment of portions of the Welch Ditch, <br />construction of a dropout structure on the Welch Ditch, a pipeline from the Agricultural Ditch to <br />the Welch Ditch, and construction of three lift stations to pump water from the Agricultural Ditch <br />back to the Welch Ditch at various locations, The need for the project is due to several landslide <br />areas along the Welch Ditch, which continue to create high maintenance and water deliver; <br />problems for the company, The project is located in Jefferson County east of Green Mountain. <br />Mountain States Engineering Associates, mc, of Lakewood prepared the project design, The <br />pipeline and dropout-structure project commenced construction November 3, 1997 by T, Lowell <br />Construction, Inc. of Castle Rock, Colorado and was completed in April 1998, The first of three . <br />pump station projects commenced in early February with the owner acting as the general <br />contractor, The overall project is approximately 50% complete and scheduled for completion in <br />November 1998, <br />