Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />DECKER LATERAL DITCH CO. - DECKER LATERAL DITCH REHABILITATION <br /> <br /> <br />Looking North Along the Concrete-Lined Decker Lateral Ditch and Ditch Access Road <br /> <br />Proiect Description <br /> <br />This $145,000 project is the concrete lining of approximately 8,800 feet ofan existing open <br />channel irrigation ditch in Weld County northeast of Greeley, The Greeley Office of the Natural <br />Resource Conservation Service prepared the project design. The construction contract was <br />awarded to CG&S Company, mc, of Greeley, Colorado November 5, 1997, Project construction <br />commenced November 18, 1997 and was substantially completed May 22, 1998, <br /> <br />Proiect Data <br /> <br />Sponsor: Decker Lateral Ditch Company <br /> <br />County: Weld <br /> <br />River: Owl Creek <br /> <br />Terms of Loan: $100,000 @4,25% for 30 yrs <br /> <br />Substantial Completion Date: May 22,1998 <br /> <br />Design Engineer: Natural Resource Conservation Service - Greeley Office <br /> <br />Construction Coutractor: CG&S Company, mc, - Greeley, Colorado <br /> <br />Design Criteria: Concrete Lined Trapezoidal Ditch: <br />Length = 8,800 feet <br />Depth = 40 in, - 16 in, <br />Design Discharge = 33 cfs - 14 cfs <br /> <br />Bottom Width = 2 feet - 1 foot <br />Concrete Turnout Division Boxes = 5 <br /> <br />Annual Volume of Water Delivered by the Project: 17,560 ac,ft. <br />