Laserfiche WebLink
<br />, <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Windsor Reservoir and Canal Companv - Poudre Vallev CanaVCobb Lake Pipeline <br /> <br /> <br />Placement of the Poly-Vinyl Chloride Liner Along the Poudre Valley Canal <br /> <br />Proiect Description <br /> <br />The Windsor Reservoir and Canal Company has initiated a 15 year staged rehabilitation <br />program of its 25 miles of canals and 6 reservoirs, The first project was the poly-vinyl-chloride <br />(pVC) lining and installation of conduits in two sections of the Poudre Valley Canal. The second <br />project consisted of the replacement of Cobb Lake's outlet pipe connecting to an outlet channel <br />2,500 feet downstream, Smith Geotechnical of Fort Collins, Colorado completed the project design <br />for both projects, The construction contracts were awarded to Barker Construction Co" Inc, ofFt. <br />Collins (December 1996) and Zak Dirt, Inc, ofLongmont, Colorado (October 1997, A third project <br />associated with this loan authorization is scheduled to commence in 2001. <br /> <br />Proiect Data <br /> <br />Sponsor: Windsor Reservoir & Canal Co, County: WeldILarimer River:Cache la Poudre <br /> <br />Terms of Loan: $569,000@4,15% for 30 years <br /> <br />Substantial Completion Date:June 17, 1998 <br /> <br />Desigu Engineer: Smith Geotechnical Consultants, Inc, - Ft. Collins, Colorado <br /> <br />Construction Contractor: Barker Construction Co" Inc, - Ft. Collins, Colorado <br />Zak Dirt, Inc, - Longmont, Colorado <br /> <br />Design Criteria: <br /> <br />Poudre Valley Canal Lining = 1,600 linear feet <br />Cobb Lake Outlet Pipeline = 2,000 lin.ft, of 48 in. dia, concrete pipe <br /> <br />Annual Volume of Water Delivered by the Project: 10,500 ac.ft, <br />