Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />FARMERS INDEPENDENT DITCH CO. - DITCH REHABILITATION PROJECT <br /> <br /> <br />Looking North at the Upstream Concrete Entrance Box and Trash Rack <br /> <br />Proiect Description <br /> <br />This $50,000 project is the construction of approximately 500 linear feet of 42-inch <br />diameter corrugated polyethylene pipeline replacing an existing open ditch in poor condition, The <br />project is located in Weld County southwest of Evans. The Greeley Office of the Natural Resource <br />Conservation Service prepared the project design. Project construction commenced by Robb's <br />Repair, Inc, of Evans, Colorado November 10, 1997 and was substantially completed April 29, <br />1998, <br /> <br />Proiect Data <br /> <br />Sponsor: Farmers Independent Ditch Co, County: Weld <br /> <br />River: South Platte River <br /> <br />Terms of Loan: $37,586 @3,75%for30yrs, <br /> <br />Substantial Completion Date: Apr, 29,1998 <br /> <br />Design Engineer: Natural Resource Conservation Service - Greeley Office <br /> <br />Construction Contractor: Robb's Repair, Inc, - Evans, Colorado <br /> <br />Design Criteria: 500 feet of 42-inch diameter corrugated polyethylene pipe <br /> <br />Annual Volnme of Water Delivered by the Project: 15,000 ac,ft, <br />