My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00455
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00455
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:50:23 PM
Creation date
10/4/2006 6:38:21 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/7/1967
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />::>OQU <br /> <br />in the commissioner's office. The report should <br />be released shortly. I imagine you have heard <br />that statement many times but they inform me <br />that it really will be released shortly. <br /> <br />On the Fryingpan-Ar]~ansas project, which 1 <br />is our largest construction project in our <br />region, the contractor for the construction of <br />Ruedi Dam has completed 88 percent of the con- <br />tract with about 86 percent of the contract <br />time gone. The contractor for clearing and <br />fencing of Ruedi is practically complete with <br />99.7 percent completed with 80 percent of the <br />time gone. <br /> <br />The contractor for construction of the <br />Divide, South Fork, and Chapman Tunnels, diver- <br />sion dams, and appurtenant structures of the <br />South Side Collection system has completed 62 <br />percent of the contract. Excavation of the <br />tunnels has progressed as follows: Divide, <br />19,1OO feet with 9,000 feet to go; South Fork, <br />some l6,000 feet with some 400 feet to go. The <br />contractor continued concrete placements in the <br />curb and false invert in Chapman Tunnel. Con- <br />crete placements were resumed for the Chapman <br />Diversion Dam and feeder conduit. Clearing and <br />excavation activities were initiated in the <br />Fryingpan Valley area and the South Fork Valley <br />area. <br /> <br />The contractor for construction of Sugar <br />Loaf Dam and roads has completed 35 percent of <br />the contract with about 52 percent of the con- <br />tract time elapsed. The contractor continued <br />placing Zones 1, 2, and 3 in the dam effibaru,ment <br />and initiated rip-rap placement on the upstream <br />face of the dam. Diversion of Lake Fork Creek 1 <br />through the outlet wOD,s was accomplished on <br />May 3. Concrete placements are continuing on <br />the spillway conduit. <br /> <br />The contractor on the major portion of the <br />county Road No. 104 relocation and improvement <br />had completed 99~ percent of the contract with <br />
The URL can be used to link to this page
Your browser does not support the video tag.