My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00455
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00455
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:50:23 PM
Creation date
10/4/2006 6:38:21 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/7/1967
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~v~-' <br /> <br />1 <br /> <br />On the Narrows unit, and I know you are <br />real interested in that report, the Commission- <br />er's proposed report to the Secretary of the <br />Interior is still in the process of being <br />reviewed. We had to make a ne~l evaluation of <br />that from the standpoint of releases for water <br />quality control and this analysis will be in <br />the report. rt is physically possible although <br />it doesn't fit in with the present water laws <br />of the State of Colorado. When this report is <br />adopted and approved by the Secretary it will <br />be fon.arded to the state for its comments. <br /> <br />We also, in that regard, made some studies <br />to show the effects of the operation of the <br />Narrows Unit on water users in Nebraska. There <br />appears to be nothing detrimental to their uses <br />dO\m there in Nebraska. <br /> <br />On the Upper South Platte unit, some cost <br />estimates of subreconnaissance grade were pre- <br />pared of single purpose alternatives for stor- <br />ing Aurora's M&I water supply. These cost <br />estimates will be used in the allocation of <br />project costs. <br /> <br />Also, an operation study was made of the <br />upper south platte-Blue-Eagle system without <br />T':10 Forks Reservoir in it just to assess the <br />reregulation effects that would be caused by <br />the Two Forks Reservoir. An operation study <br />was made on that portion of the system con- <br />sti tu ted by Bear, Turkey, and Clear Creeks. <br /> <br />Work was continued on developing criteria <br />on which to base the operating studies of the <br />overall unit. <br /> <br />1 <br /> <br />A preliminary analysis of power potentials <br />at the potential Two Forks Dam and Turkshead <br />Reservoir was completed and submitted to tl1e <br />Bureau's Washington office for policy recommend- <br />ation. <br /> <br />The reconnaissance report on the st. Vrain <br />unit was completed and is now undergoing review <br />
The URL can be used to link to this page
Your browser does not support the video tag.