My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00455
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00455
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:50:23 PM
Creation date
10/4/2006 6:38:21 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/7/1967
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />MR. CORNELIUS: <br /> <br />!,IR. GOODWIN: <br /> <br />~IR. KROEGER: <br /> <br />MR. INGLES: <br /> <br />of May 12, 1967." <br /> <br />"Mr. Chairman, I move that the minutes be <br />approved as submitted." <br /> <br />"I'll second." <br /> <br />1 <br /> <br />"It has b.~en regularly moved and seconded <br />that the minutes be approved as submitted. All <br />in favor will signify by saying 'aye'; opposed- <br />they are approved. <br /> <br />We will now have reports from the federal <br />agencies and the first will be Region 7, ~tr. <br />Ingles." <br /> <br />"Thank you, !.tr. Chairman. Members of the <br />Board, ladies and gentlemen, it didn't take me <br />long to get on the program,I see~ <br /> <br />TO give the report of Region 7, Bureau <br />of Reclamation activities in Colorado, as per <br />usual the written report was submitted and <br />parts of it will be updated as I go through <br />it. <br /> <br />One of the projects we have been working <br />on is the use of water out of Bonny Reservoir, <br />out near Wray, Colorado, near the community of <br />Armel. We met with the Armel Steering Commit- <br />tee along with Stanley Miller of the Colorado <br />Water Conservation Board staff to see what <br />could be done to restudy, in effe~t, the project <br />that we had studied back some l5 years ago. A <br />preliminary economic analysis was prepared and <br />the supporting data is being assembled. Before <br />we can go into a feasibility study, of course, <br />we will have to have congressional authoriza- <br />tion. <br /> <br />1 <br /> <br />Also in that regard we met in June in <br />Denver with the Republican River compact Admin- <br />istration to discuss the water use for further <br />developments in that area of the Republican <br />River. <br />
The URL can be used to link to this page
Your browser does not support the video tag.