Laserfiche WebLink
<br />-............ <br /> <br />irrigation of. some lands over in Nebraska in <br />accordance with the Republican River Compact. <br />There the topographic surveys for the Wray Reser- <br />voir have been completed and the planimetering <br />and other detail work on those planetable sheets <br />in order to prepare area capacity curves and" I <br />other engineering data for that reservoir are <br />well under way. Ne expect. that the report we will <br />write there will be a de'init. plan report ..,au..- <br />it is an authorized ptOj~cti but ~a expect that. <br />that report will ask for affirmation of the 1944 <br />authorization since it has been SO long since the <br />project was authorized. <br /> <br />There has been no activity since our last <br />meeting on the st. Francis Unit. Another one <br />within Colorado but handled out of the McCook, <br />Nebraska office. <br /> <br />In the North Platte Projects Office at <br />Casper which is affected with Colorado work by <br />a transmission line from Cheyenne to Hayden or <br />Hayden to Cheyenne I guess would be the better <br />way to express it here, we received ten bids on <br />that transmission line which is an interconnection <br />with the Upper Colorado River Storage and the <br />eastern portion of the transmission grid in the <br />Missouri River Basin. We had ten bids, very good <br />bids, and they are under analysis and we expect <br />the contract to be awarded there in the very <br />near future. l'le were very pleased with these <br />bids; they were quite a little under the Engi- <br />neer's estimate. <br /> <br />As I reported at the last meeting, we have <br />established a construction office in Cheyenne <br />and Mr. Greenlaw, the Construction Engineer, has <br />an office there and is establishing his work and <br />getting his crews together, so as soon as this <br />contract is awarded that office will be acti- <br />vated further and actually pursue the construc- <br />tion. <br /> <br />I <br /> <br />Our South Platte Projects Office at Loveland, <br />which is largely an operation office as you know <br />for the ColoradO-Big Thompson Project and trans- <br />mission distribution works and powerplants of <br />