My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00374
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00374
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:49:35 PM
Creation date
10/4/2006 6:37:29 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/30/1957
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,vu <br /> <br />accomplished by the cooperative <br />efforts of the U. S. Geological <br />Survey, the State'of Colorado and <br />the Bureau of Reclamation, it was <br />noticed that there might be a possi- <br />bility of developing water suitable <br />for credit under the terms of the Rio <br />Grande Compact by means of pumping <br />from wells whereby the quality could <br />be controlled. <br /> <br />This Fiscal Year the State of <br />Colorado is putting out $25,000.00 <br />which will be matched by the Bureau <br />for further investigation of these <br />possibilities which were outlined in <br />a reconnaissance report which had <br />been furnished the Colorado Water <br />Conservation Board in March of 1956. <br />To date the invest~gations are pro- <br />ceeding as scheduled and a week ago <br />last Thursday a meeting was held in <br />Denver to discuss the worK accom- <br />plished to date and the work contem- <br />plated. Present at this meeting were <br />representatives of the Bureau of Recla- <br />mation, Dr. Thad McLaughlin, U. S. <br />Geological Survey and a member of the <br />Closed Basin Drain Committee and ~r. <br />R. M. Gildersleeve, the Chief Engineer <br />of this Board. It was agreed at the <br />conclusion of this meeting that the <br />work done to date seemed to be suffi- <br />cient to give us the information de- <br />sired. The work contemplated also ap- <br />peared to be at this time sufficient <br />to give us the information desired on <br />the pumping tests which now become the <br />critical data that we need. <br /> <br />I <br /> <br />In addition to the contribution <br />by the State of Colorado through your I <br />Board, Dr. McLaughlin will make avail- <br />able a special drill rig for the <br />drilling of the deep observation wells . <br />and will supply the services of at <br />least one engineer qualified to conduct <br />pumping tests and will analyse all <br />pump test data for report to be pre- <br />pared by the Bureau of Reclamation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.