My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00330
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00330
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:48:46 PM
Creation date
10/4/2006 6:35:51 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/27/1968
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />Approximately 3.879 feet of arch concrete <br />section was placed during February for a <br />total placement of 11.700 feet. Approxi- <br />mately 2.897 feet of arch setting remains to <br />be placed. No concrete for the invert sec- <br />tion has been placed. <br /> <br />In February. the contractor for the <br />South Fork Tunnel placed 6.244 feet of con- <br />crete curbing section for a total placement <br />of 11.700 feet. leaving a 4.544-foot section <br />to be completed. The total arch lining <br />placed is a l45-foot section. The remaining <br />arch lining to be placed is 16.090 feet. No <br />concrete for the invert section on the South <br />Fork Tunnel has been placed. <br /> <br />The contractor for construction of the <br />Sugar Loaf Dam and the roads has completed <br />95.4 percent of the contract. About 67.7 <br />percent of the contract time has elapsed. <br />In February. the contractor prepared for <br />placement of second stage concrete in the <br />outlet works. and continued the installation <br />of metalwork. <br /> <br />The several contractors for construction <br />of County Road No. 104 relocation and im- <br />provements for Ruedi Dam and vicinity have <br />completed the work under the contracts. At <br />a later date. a contract will be awarded to <br />complete surfacing of approximately 2 miles <br />of road and a parking area near the Ruedi <br />Dam. <br /> <br />I <br /> <br />The contractor for construction of the <br />subgrade and structures for the relocation of <br />the Denver and Rio Grande Western Railroad at <br />the Pueblo Reservoir has completed 31.4 per- <br />cent of the contract - 28.5 percent of the <br />contract time has elapsed. <br /> <br />Under the Upper Colorado River Storage <br />project. the contractor for construction of <br />the poncha-Midway Section of the Curecanti- <br />Midway 230-kv transmission line has essentially <br />