My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00330
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00330
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:48:46 PM
Creation date
10/4/2006 6:35:51 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/27/1968
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~~~q <br /> <br />expanded to reflect the power operations. <br /> <br />On the St. Vrain unit of the Missouri <br />River Basin Project the Regional Project <br />Development Engineer and the Investigations I <br />Engineer met with the Cache la poudre Steer- <br />ing Committee on January 22. The Investiga- <br />tions Engineer met with the Boulder Creek- <br />St. Vrain Steering Committee on January 29. <br />Both meetings were for the purpose of dis- <br />cussing the results of the St. Vrain unit <br />reconnaissance studies and to advance the <br />proposal to enlarge the St. vrain feasibility <br />studies to include the Cache la poudre area. <br />A new name, the Front Range unit, would be <br />adopted for the integrated unit. <br /> <br />As to the Fryingpan-Arkansas project, <br />the contractor for construction of Ruedi <br />Dam has completed 92.5 percent of the con- <br />tract with 96.9 percent of the contract time <br />elapsed. This was as of February 29, 1968. <br />The contract for clearing Ruedi Reservoir <br />was completed and all clearing work was <br />accepted by the Government on November 10, <br />1967. <br /> <br />The contractor for construction of the <br />Divide, South Fork, and Chapman Tunnels, <br />Diversion Dams, and Appurtenant Structures <br />of the South Side Collection System has com- <br />pleted 77.3 percent of the contract with <br />78.1 percent of the allowed time elapsed. <br />Approximately 23,622 feet have been ex- <br />cavated, and approximately 4,889 feet <br />remains to be excavated. Poor material <br />has slowed drilling progress on the Divide <br />Tunnel. To cope with this problem the con- <br />tractor has installed a concrete plug at <br />the heading and is in the process of grout- <br />ing to stabilize the material. <br /> <br />I <br /> <br />The contractor for the Chapman Tunnel <br />placed 306 feet of concrete curbing section, <br />bringing the total placement to 14,330 feet - <br />267 feet of curbing remains to be placed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.