My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00295
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00295
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:48:20 PM
Creation date
10/4/2006 6:35:01 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/10/1981
Description
CWCB Meeting
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />The proposed dam would be an earth-fill or rock-fill embankment <br /> <br /> <br />about 70 feet high with a crest length of approximately 310 <br /> <br /> <br />feet. The storage capacity of the resevoir would be 2,120 <br /> <br /> <br />acre-feet. A conditional storage right in such an amount was <br /> <br /> <br />adjudicated to the company in February, 1972, with a priority of <br /> <br /> <br />September 16, 1963. The dam and reservoir would be located <br /> <br /> <br />totally on U.S. Forest Service land. The water supply developed <br /> <br /> <br />by the project would be used for supplemental irrigation late in <br /> <br /> <br />the season. Based on current cost data, the staff has estimated <br /> <br /> <br />that this project will cost approximately $1,000,000. <br /> <br />If proven feasible, this project would clearly be consistent <br /> <br /> <br />with the statutoy criteria set forth in 37-60-121(1)(b), C.R.S. <br /> <br /> <br />1973, as amended (see section 3 of S.B. 439). <br /> <br />FMA/gl <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.