Laserfiche WebLink
<br />CWCB North Fork <br />7/5/2005 <br />Page 4 <br /> <br />See Figure 1 and Table 1. <br /> <br />7. Estimate potential future land uses in the reaches affected by the ISF filings. Future <br />land uses will be used as a basis for estimating potential water demands. Outreach <br />will be conducted to the towns and counties and activities coordinated with the North <br />Fork Steering Committee. Working with the county planners, existing and potential <br />future land uses will be mapped and inventoried. <br /> <br />Completion: <br />Assignment: <br /> <br />August 1 <br />CRWCD/CDM/CWCB <br /> <br />STATUS: GIS coverages of land uses were obtained from counties and <br />supplemented with other information as noted below. Follow up discussions with <br />county and local planners and officials will be needed to determine the potential <br />for future development of existing irrigated and non-irrigated agricultural lands. <br />See attached CDM memo for discussion and analysis of land uses. <br /> <br />8. Develop a proposed approach and draft language designed to preserve the ability for <br />future known water uses to be senior to proposed CWCB ISF rights. This proposal will <br />be reviewed by CWCB staff to determine if a consensus recommendation can be made <br />on this issue. <br /> <br />Completion: <br />Assignment: <br /> <br />September 1 <br />Division Engineer and CRWCD <br /> <br />STATUS: Pending <br /> <br />9. Project future water demands. Using the estimates of potential future land uses <br />provided in Task 7, projections of future water demands will be made. Existing water <br />demand studies, to the extent provided by counties, towns, conservancy 1 conservation <br />districts, and others will be reviewed and used as a basis for demand projects, if <br />appropriate. An overall water balance will be used to estimate the net change in <br />demands as existing irrigated lands may be converted to residential or other uses. <br /> <br />Completion: <br />Assignment: <br /> <br />September 1 <br />CDM (CWCB) <br /> <br />STATUS: Future water demand spreadsheet has been completed and estimates of <br />potential future water demands will be made after consultation on future land uses <br />with county and local officials, Division Engineer and CRWCD. <br /> <br />10. Outreach to local landowners and water users. The purpose of the outreach will be to <br />inform landowners and water rights holders of the need to file water rights <br /> <br />S :\GI S\working\Jinal_ memo\CW CB _ N _Fork070505.doc <br />