My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00285
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00285
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:48:14 PM
Creation date
10/4/2006 6:34:54 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/18/2005
Description
ISF Section - Contested Instream Flow Appropriations Request to Table Until 2006
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB North Fork <br />7/5/2005 <br />Page 2 <br /> <br />2. Provide mapping of subbasins upstream of proposed ISF reaches and GIS coverage of <br />subbasin delineations and SEO well permit database. <br /> <br />Completion: <br />Assignment: <br /> <br />May 25 <br />Colorado River Water Conservation District (CRWCD) <br /> <br />STATUS: Complete <br /> <br />3. Preliminary evaluation of existing undecreed uses in subbasins upstream of proposed <br />ISF reaches. Through the use of aerial photography and State Engineer's database, <br />summarize a range of potential depletions from ponds, springs, and wells. <br /> <br />Completion: <br />Assignment: <br /> <br />June 10 <br />CWCB (CDM) <br /> <br />STATUS: Aerial photography was not available. Division 4 Engineer's office <br />estimated based on field work and meetings with water users. See Table 1 below. <br /> <br />Table 1- Estimated existing uses, both decreed and undecreed, in the North Fork of <br />the Gunnison River basin that are in need of augmentation water. These numbers <br />do not include irrigation rights, only springs and ponds used for domestic, stock <br />and evaporation uses <br /> <br />Sub-basin Decreed (aflyr) Undecreed (aflyr) <br />Anthracite Creek 6 12 <br />Muddy Creek 12 25 <br />Hubbard Creek 2 2 <br />Terror Creek 2 2 <br />Lerous Creek 2 5 <br />'North Fork (ab Short D) 5 5 <br />Gunnison 1 1 <br />Crawford 5 20 <br />Crystal Creek 1 1 <br />Smith Fork 3 6 <br />Coal Creek 2 1 <br />Total 41 80 <br />'North Fork (bl Short D) 5 10 <br /> <br />1 Since the call on the North Fork is only above the Short Ditch, the North Fork sub- <br />basin was divided into two different areas. <br />Source: Schieldt, Wayne. "North Fork Gunnison River Basin consumptive use <br />estimates." Email to Kelly DiNatale. 29 June 2005. <br /> <br />S :\GI S\working\Jinal_ memo\CW CB _ N _Fork070505.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.