Laserfiche WebLink
<br />CDIVI <br /> <br />Memorandum <br /> <br />To: Todd Doherty and Jeff Baessler, CWCB <br /> <br />From: Kelly DiNatale, COM <br /> <br />CC: Erin Wilson, LRE <br />Wayne Schieldt, Assistant Division 4 Engineer <br />Dave Kanzer, CRWCD <br /> <br />Date: July 5, 2005 <br /> <br />Subject: Update on CWCB North Fork Gunnison ISF Water Availability <br />Analysis <br /> <br />CWCB authorized CDM and Leonard Rice Engineers to look at existing and future water <br />demands and water availability in the North Fork and Smith Fork areas in conjunction with <br />the proposed in stream flow water rights applications. This memorandum documents the <br />process and status of the analysis of existing and future water demands as outlined in the <br />May 6 memo from Kelly DiNatale and Erin Wilson. This memo was included as an <br />attachment in the May CWCB Board packet. <br /> <br />Status of proposed work plan items <br /> <br />The status listed for each item was not reviewed by Erin Wilson, Wayne Schieldt or <br />Dave Kanzer and they may have modifications or additions to the status of each work <br />plan item. <br /> <br />. Phase 1 Preliminary Analysis - documentation of existing uses and available flow <br /> <br />1. Review of proposed action plan at CWCB May Board meeting to determine if <br />proposed action plan and deadlines are acceptable and if acceptable, delay action until <br />July board meeting. <br /> <br />Completion: <br />Assignment: <br /> <br />May 24-25 <br />CWCB <br /> <br />STATUS: Complete <br /> <br />S :\GI S\working\Jinal_ memo\CW CB _ N _Fork070505.doc <br />