My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00284
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00284
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:48:13 PM
Creation date
10/4/2006 6:34:50 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/12/1971
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />yield that we are getting. We are now saying <br />that Two Forks Reservoir should be constructed <br />by about 1987 or 1989 and if this were to be <br />delayed any substantial amount it would be <br />critical. I would prefer to see it go on the <br />shorter side than to extend." <br /> <br />I <br /> <br />MR. SPARKS: <br /> <br />"From the time the project is authorized <br />to the time it was completed we estimated that <br />there would be a ten-year time lag. Then we <br />are talking about securing authorization of <br />Two Forks sometime in the 1970's, if you are <br />talking about 1987 completion." <br /> <br />MR. OGILVIE: <br /> <br />"Yes, I think this is certainly right. <br />In fact I, in working with the Bureau of <br />Reclamation, am shooting for an earlier date <br />than that. We are moving along with the Two <br />Forks plan. I'think it is rather urgent and <br />the Bureau and the Water Department are cooper- <br />ating on this. We are shooting to move this <br />reservoir along about as rapidly as is consis- <br />tent with good planning and due consideration <br />of all aspects of the development of the plan. <br />If we do this, it is my opinion that it will <br />just about fit into the 1987 date based on a <br />construction period of ten years." <br /> <br />MR. SPARKS: <br /> <br />"There has been recently issued by ROMCOE <br />an environmental report in connection with Two <br />Forks. This report emphasizes the increased <br />difficulty which will be experienced in getting <br />projects such as Two Forks authorized. <br /> <br />I agree whOleheartedly that it is important <br />to get it authorized as rapidly as possible. <br /> <br />We received one copy of that environmental <br />report. I don't think the Board members have <br />seen it, nor members of the audience. It was I <br />an in-depth report based upon the possible con- <br />struction of the Two Forks Reservoir as to its <br />environmental impact. The report was factual, <br />I think, in many instances. However, one of the <br />main themes of the report was that additional <br />
The URL can be used to link to this page
Your browser does not support the video tag.