<br />O::;l~"t <br /> <br />, <br /> <br />here to Oak Ridge, this is the upper end of <br />Oak Ridge, into the Little Beaver Basin. We <br />will meet that requirement. We do have about <br />1.4 miles of crossing structures built into <br />the design of the canal already and we will <br />add additional crossings and fencing as recom- <br />mended by the Game, Fish and Parks Commission <br />in our plan. <br /> <br />I <br /> <br />This list of structures along the Yellow <br />Jacket Canal indicates all of the structures <br />that will be buried type such as siphons, <br />buried pipes and bridges and so on that could <br />be used for crossings. In this upper reach of <br />the canal we have 1.4 miles of it. Then in <br />the canal down below Oak Ridge where it comes <br />around the north side of the Little Beaver <br />Basin, we have about 2.2 miles of crossing <br />structures along the canal that can be used <br />for crossings and additional ones can be added <br />according to this recommendation. <br /> <br />Also on the Josephine Canal line, which is <br />another canal line which runs around the east <br />side of the Little Beaver Basin, it is recom- <br />mended that we have ten deer crossings at a <br />cost of about $40,000. We have included that <br />in our costs for the project and in our plans. <br />This list shows the crossings that are already <br />built into our canal lines, 4~ miles of them <br />along the Josephine Basin Canal which includes <br />several long siphons, tunnels and bridges and <br />this type of thing that are crossing structures. <br /> <br />Item eleven, recommendation eleven, they <br />ask that we design both the Yellow Jacket Canal <br />and the Josephine Basin canal so that deer <br />would not get stuck in the canal: so they <br />could cross it and safety items so they would <br />not go into the siphons and so on. We are <br />building this into it. Here is a typical sec- <br />tion of our canal. In most cases they will <br />have a two to one side slope and where it is <br />going to be lined, we tentatively plan on it <br />being lined with earth lining so we will not <br /> <br />I <br />