My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00273
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00273
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:48:04 PM
Creation date
10/4/2006 6:34:45 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/20/2000
Description
CF Section - Special Purpose Accounts and CWCB Flood Emergency Response Fund
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />7 <br /> <br />. <br /> <br />Evaluation of CWCB Floodplain Mapping and Revisions as Needed <br /> <br />e <br /> <br />Present Action: <br /> <br />A cursory review and sketch comparison of the flooded area outline to any existing <br />CWCB designated 100-year flood outline is made, Estimates of flood discharges and <br />floodwater elevations are prepared for some flood disasters. <br /> <br />Present Fundim!: <br /> <br />No mechanism for a formal investigation or assessment is in place, <br /> <br />Proposed Action: <br /> <br />The CWCB, in cooperation with the DNR Division of Purchasing, will develop a <br />standing annual contractual agreement for placing an engineering consulting firm in <br />service on July L Contracted services will include evaluation of the CWCB's designated <br />floodplain studies and revisions to mapping, if necessary. Contracting will be performed <br />by different firms to prevent conflicts of interest. Revisions or new mapping will require <br />1) community agreement to proceed, and 2) a fifty percent (50%) cost share by the <br />affected local govemment(s), Any Notice to Proceed will be under the instruction of the <br />CWCB Director. <br /> <br />Proposed Funding: <br /> <br />e <br /> <br />Establish an annual account within the CWCB's five percent (5%) of the construction <br />fund dedicated to flood projects, Estimated annual budget: $30,000, <br /> <br />Benefits: <br /> <br />. Confirmation of precipitation and hydrologic values, <br /> <br />· Verification of hydraulic conditions in a flood and of validity of 100-year flood <br />inundation areas, <br /> <br />· Re-engineering 100-year floodplain limits, if applicable, <br /> <br />· Understanding ofrelative depths of flooding in various parts of the 100-year <br />floodplain to determine areas subject to the greatest damage, <br /> <br />· Confirmation of the most accurate 100-year designated floodplain boundaries. <br /> <br />e <br />
The URL can be used to link to this page
Your browser does not support the video tag.