My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00261
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00261
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:47:58 PM
Creation date
10/4/2006 6:34:33 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/13/1964
Description
Table of Contents, Agenda, Minutes and Resolution
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.J:;JV."'"' <br /> <br />work again on the lateral systems there. The <br />work was shut down during the winter. <br /> <br />Now on the silt Project we have awarded <br />a bid for the construction of our laboratory <br />and field office and just this week we moved <br />into our permanent offices at Silt. We will <br />open bids on June 23rd on Rifle Gap Dam. <br /> <br />I <br /> <br />Moving on to the transmission lines, work <br />is just about on schedule on all of those <br />lines. On June 11th we will call for bids for <br />another section, l24-mile-long Glen Canyon to <br />Flagstaff 345-Kilovolt line. <br /> <br />So much for construction and I see that <br />the next part of my report is already out of <br />date. That is, the filling of the storage <br />units. I might give you just a little inform- <br />ation" the last information, as to storage in <br />each one of these reservoirs: <br /> <br />At 8:00 A. M. on May 11th water in Glen <br />Canyon Dam was at elevation 3394.5; its capa- <br />city was 2,560,000 acre-feet. At that time the <br />inflow was approximately lO,OOO c.f.s.; the <br />outflow was about 12,400 c.f.s. <br /> <br />At 11:00 A. M. on May 11th the gates were <br />closed and the discharge from Glen Canyon was <br />reduced to about 1,000 second feet. Yesterday <br />Glen Canyon was at elevation 3395; with a stor- <br />age content of 2,573,000 acre-feet. In the <br />past day they had gained about 13,000 acre- <br />feet in the reservoir. The outflow was down <br />to 1,000 second feet and the inflow was around <br />10,000 second feet. <br /> <br />I have the last figures on May 8th here <br />on the other storage units. At Navajo, the <br />elevation was 5,940.44; we had a total surface <br />content there of 380,200; discharge was about <br />500 second feet. At Flaming Gorge on May 8th <br />the elevation in the reservoir was 5,938.35 <br />with a content of about 973,500 acre-feet. We <br />were gaining in here on that date at the rate <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.