Laserfiche WebLink
<br />. <br />, <br /> <br />'. <br />" <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />the number of participants in the pipeline will be determined by <br />September of this year and that the pipeline design study will be <br />completed by December 1st of this year. <br />The city of Broomfield will utilize the work done for the <br />NCWeD along with other information to prepare a complete <br />feasibility study for the Reservoir Replacement Project to be <br />submitted to the CWCB on December 1st of this year. <br /> <br />PROJECT SCHEDULE <br />The current schedule calls for engineering design in 1992, <br />construction in 1993 and 1994 with the project to be operational by <br />January 1, 1995. <br /> <br />6 <br /> <br />. _. <br />.- -_~""''''''''''''''''--''''___''".t~''''''''''''''''....UI.___~'____ <br /> <br />" ., .--~~~;~....._,..;......;:..._.....-".....~>.-;,;....;;...~..:..-.-.:;......;...;.. <br />