My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00234
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00234
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:47:24 PM
Creation date
10/4/2006 6:33:47 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/23/2002
Description
CWCB Director's Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br /> <br /> <br />The CWCB has been heavily involved with providing technical assistance to Otis. This goal of <br />this particular effort is to produce a new floodplain delineation study for a tributary that has caused past <br />flooding in portions of the cormmmity. New hydrologic analyses were established to re-defme the peak <br />flows coming into tOWll. The draft floodplain delineation study has been completed and submitted to the <br />tOWll. Once that study has been finalized and accepted by the tOWll, the consultant will present the <br />reconnaissance study, which outlines various flood hazard mitigation options for the south side of Otis. <br /> <br />6. Alamosa-La Jara Water Conservancv District - Field Survev and Hvdraulic Aualvsis <br />Authorization: LongBiIl GrantAmount: $16,000 <br />Water Source: N/A Type: Field survey & hydraulic analysis <br />Location: Alamosa River in & around Capulin Project Manager: Brian Hyde <br /> <br />This project is funding the necessary field surveys to provide hydraulic cross-sections for a 5-mile <br />reach of the Alamosa River in and around Capulin and the completion of a hydraulic analysis of flooding <br />conditions in that stream reach. The reach is the subject of a separate CWCB grant for the design and <br />construction of stream restoration improvements. The hydraulic analysis will determine the flow capacity <br />of the existing stream channel and bridges. In the future, modifications designed as part of the stream <br />restoration project can be tested hydraulically prior to construction by simply modifying the hydraulic <br />model. The field surveys have been completed and the hydraulic analysis has been conducted. <br /> <br />7. <br /> <br />South Platte Diversion Structure Inventory Proiect <br />Authorization: Long Bill <br />Water Source: South Platte <br />Location: Weld County <br /> <br />Grant Amount: $30,465 <br />Project Typ~: Structure Inventory <br />Project Manager; Tim Feehan <br /> <br />The Colorado Water Conservation Board is currently evaluatiug the existing condition of various <br />diversion structures along the South Platte River. The limits of the diversion structure inventory project <br />within the South Platte Basin are from the City of Henderson to the State Line. The information being <br />obtained in the field include visual site inspection of the structure, documentation ofthe structure <br />condition, type, and size, digital photos, GPS coordinates, and repair/replacement costs where warranted. <br />The final product developed will be used as a marketing tool by the Water Supply, Planning, and Finance <br />Section staff to inform various ditch companies of the condition oftheir diversion structure, along with a <br />possible funding solution to have it repaired or replaced. <br /> <br />In April of2002, the Colorado Water Conservation Board entered into a Contract with the <br />Farnsworth Group, Denver, Colorado, to evaluated the condition ofthe existing diversion structures along <br />the South Platte River, from the City of Henderson to the State Line. The State of Colorado Division I <br />Engineer's Office in Greeley, Colorado has broken this area doWll into three separate districts; District 1, <br />District 2, and District 64. Currently the Farnsworth Group has completed all the inventory work for <br />District 2, which incorporates an area along the South Platte from the City of Henderson to the City of <br />Keensburg, and they are currently in the field working on District I. The consultant is expected to have <br />all fieldwork completed by the September of2002, with the final report being completed by November of <br />2002. . All project funds for 'fiscal year 2002 have been expended. Remaining funds that are not <br />expended to complete the inveutory along the South Platte will be used to inventory the existing diversion <br />structures along the Arkansas River, from approximately the City Fowler to the State Line. <br /> <br />8. <br /> <br />Upper Gunnison River Water Conservancv District - Regional Water Planning Studv for the <br />Upper Gunnison Basin <br />Authorization: Long Bill <br />Water Source: Upper Gunnison River <br />Location: Gunnison & Saguache Counties <br /> <br />Grant Amount: $20,000 <br />Project Type: Study <br />Project Manager: John Van Sciver <br /> <br />Page 27 of3 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.