My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00231
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00231
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:47:19 PM
Creation date
10/4/2006 6:33:45 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/8/1961
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />MR. DUNBAR: <br /> <br />MR. STAPLETON: <br /> <br />MR. KUIPER: <br /> <br />MR. STAPLETON: <br /> <br />MR. KUIPER: <br /> <br />have the Attorney General with us. We are <br />honored, Duke." <br /> <br />"Thank you. My legal counsel is otherwise <br />engaged today." <br /> <br />"He has certainly been getting his name in <br />the papers. <br /> <br />I <br /> <br />The next agenda item is #3, a 'Report from <br />the South Platte Steering Committee', and <br />,Kuip, would you take that over please." <br /> <br />"Mr. Gildersleeve, who has taken Larry's <br />place on the South Platte Steering Committee, <br />submitted a written report Which is in your <br />folders. unfortunately Gil is sick today and <br />is not here. Would you like to have that read, <br />Ben, or how do you want to handle it?" <br /> <br />"It's short, why don't you read it so the <br />members of the audience can have the benefit <br />of it." <br /> <br />"'The South Platte Steering Committee held <br />its second meeting on October 6, 1961. At this <br />meeting a site selection report was submitted <br />to the committee by the Bureau of Reclamation. <br />This report presented comparative evaluations <br />of alternate main stem reservoirs at the Weld <br />County and Narrows sites. <br /> <br />Construction costs, without control of <br />Bijou Creek floods, would be about $7,000,000 <br />higher for the Weld County site than for the <br />Narrows site. With Bijou control included, the <br />costs of the Weld County site in conjunction with <br />a reservoir at the Wiggins site on Bijou Creek <br />would be more than $ll,OOO,OOO higher than those <br />for the Narrows site including the Bijou dykes <br />and channel. These costs are based on recon- <br />naissance or preliminary estimates. <br /> <br />I <br /> <br />Discussion among members of the committee <br />indicated that they were not willing to agree <br />on the selection of a site on the basis of con- <br />struction costs alone. It was felt that a major <br />
The URL can be used to link to this page
Your browser does not support the video tag.