My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00222
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00222
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:47:11 PM
Creation date
10/4/2006 6:33:32 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/22/1999
Description
CF Section - Loan De-Authorization Review
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />e <br /> <br /> <br />300 West Fourth Street <br /> <br />(970) 824-8151 <br /> <br />(970) 824-6539 Fax <br /> <br />Craig, Colorado 81625 <br /> <br />October Hi, 1999 <br /> <br />RECEIVED <br />NOV C 5 1999 <br /> <br />Mr. William E. Green, P.E. <br />Colorado Water Conservation Board <br />721 Centennial Building <br />1313 Sherman Street <br />Denver, CO 80203 <br /> <br />Colomco Water <br />Conservation Board <br /> <br />Subject: Elkhead Dam/Reservoir Rehabilitation Financing Assistance <br /> <br />Dear Bill: <br /> <br />This letter is in response to a telephone conversation you had with our consulting <br />engineer for this project, Ayres Associates, on October 15, 1999. We understand that <br />you need a letter explaining the status of this project, the work completed during the last <br />year and our desire to have this project remain on the list of projects authorized for loan <br />assistance from the Colorado Water Conservation Board. <br /> <br />As Doug Laiho mentioned to you on Friday, the project has made a significant amount of <br />progress since last year's status letter to Bill Stanton, dated November 9, 1998. That <br />letter also provides a historical summary of the project. <br /> <br />In summary, it is the intent of the City of Craig to continue to diligently pursue the <br />acquisition of Elkhead Dam/Reservoir and its rehabilitation (without an increase in <br />storage at this time) at least through the preliminary engineering stage. This should <br />provide us with current information on the project costs and other factors needed to <br />decide the project's future for the City's best interests. Since this time last year the <br />following items have been accomplished: <br /> <br />. The rehabilitation hydrology report was submitted during January of 1999. <br />. The hydrology report was approved by the SEO with minor revisions on March 4, 1999 <br />(a final composite copy with approval documentation was provided to your office). <br />. A meeting between Craig and the DOW was held on January 29 in Glenwood <br />Springs to discuss the project status in respect to the "Exchange Agreement." It was <br />agreed that there was mutual interest to continue, and that there was a need to <br />update the Agreement at least in respect to the implementation schedule (refer to <br />your copy of the July letter summarizing this meeting and the commencement of <br />preliminary design). . <br />. Several telephone conversations and meetings were held with the "Yampa <br />Participants" (the other project water rights owners) to verify their continued interest <br />and desire for involvement in the rehabilitation project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.