My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00222
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00222
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:47:11 PM
Creation date
10/4/2006 6:33:32 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/22/1999
Description
CF Section - Loan De-Authorization Review
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Elkhead Reservoir <br /> <br />. <br /> <br />An authorization of $750,000 for Elkhead Reservoir was included in SB 86-27. The <br />authorization does not identify a project or a project sponsor. <br /> <br />In 1987, Morrison Knudsen Engineers submitted a feasibility study for a project that <br />included a spillway enlargement and an increase in reservoir capacity of2,400 acre-feet <br />at an estimated cost of$I,338,845. The report indicates that this is the project that was <br />intended by the 1986 authorization. The study identified several project participants <br />including the City of Craig. <br /> <br />For the past several years, the City of Craig and others have been conducting analyses <br />and studies ofElkhead Dam and Reservoir by Ayres Associates with the intent of <br />eventually acquiring the reservoir from the current owner, the Division of Wildlife. <br />Ownership would be obtained through an "Exchange Agreement" in which the City <br />would exchange land for the dam and reservoir. <br /> <br />A recent hydrology study by Ayres Associates has demonstrated that a spillway <br />enlargement for the existing reservoir is unnecessary. The study has reportedly been <br />accepted by the State Engineer's Office. The City is not intending to enlarge reservoir <br />storage capacity at the present time. Studies are currently being conducted to determine <br />the cost of relatively minor rehabilitation work needed on the spillway, stilling basin and <br />outlet gates. <br /> <br />The City of Craig is requesting that the authorization not be closed out in order that funds <br />may be available, if needed, for the rehabilitation work. Please see the attached letter <br />from Jim Ferree the City Manager. Mr. Ferree has indicated that the City is unlikely to <br />request any further extensions of the authorization. <br /> <br />. <br /> <br />Staff recommends that Elkhead Reservoir, as authorized in SB 86-27, not be <br />deauthorized. It is understood that 2000 would likely be the final year of authorization <br />and that the City would submit an updated feasibility study within the next few months to <br />provide, as a minimum, a description and evaluation of the proposed project as well as a <br />financial plan. Staff would request Board approval of the revised project before entering <br />into a loan contract. <br /> <br />Please see Agenda Item No. II f. for a recommended change in the authorization to <br />identify the City of Craig as the project sponsor for a reservoir rehabilitation project. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.