My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00207
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00207
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:47:02 PM
Creation date
10/4/2006 6:33:24 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/19/2001
Description
Flood Section - South Platte River Channel Project, Easement Request for the Kahn Construction Company, Denver, CO
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br /> <br />Conditions for the Easement - If the easement is granted, the grantee shall comply with the following <br />conditions: '. , <br /> <br />1) <br />2) <br /> <br />TIME PERIOD - The EASEMENT shall be fot a tefIIl of25 years. <br /> <br />PERMITS - The grantee shall be responsible for isecuring and monitoring all required federal, <br />state, and local permits pertaining to Colorado watets and streams, <br /> <br />3) <br /> <br />INSURANCE COVERAGE - The CWCB shall be named as an additional insured, and shall have <br />coverage in the amounts established by the Colorado Governmental Immunity Act - part one of <br />article 10 of title 24, C.R.S., as amended. <br /> <br />4) <br /> <br />FEE CONSIDERATIONS. A recommendation /Nill be made that is in compliance with the <br />standard fee consideration for this request. <br /> <br />5) <br /> <br />i <br /> <br />RECLAMATION OF THE SITE - The reclamation plan and all site grading shall be developed <br />and provided to the CWCB for approval prior to the construction and completion of the project. <br /> <br />6) <br /> <br />NON-EXCLUSIVE EASEMENT CLAUSE - LlIIjguage will be stated in the easement that will <br />reserve the CWCB's right to grant, additional easements on the same land covered by this <br />easement. <br /> <br />7) NOTICE TO CWCB OF CHANGE OF OWNERSHIP OF PROPERTY - Because the Company <br />anticipates selling the development and conveying the easement to another party at point in the <br />future, the easement agreement will require the Company to notifY the CWCB prior to sale so that a <br />CWCB can ensure that the easement is assigned to :the new owner. .. <br /> <br />8) The applicant and/or agent have complied with the ,provisions of the Colorado Water Conservation <br />Board Easement Guidelines for the Chatfield Do~stream hnprovement Project dated November <br />2001, : <br /> <br />RECOMMENDATION <br />Following a review by the AG's Office and CWCB stafffor Agenda Item 16.b., staffrecornmends that the <br />Board: <br />Approve the construction easement and non-exclu~ive easement request of the Kahn Construction <br />Company, Denver, Colorado for the construction of a stormwater drainage system on CWCB <br />riglit-of-way - See attached map. Authorize staft to prepare the necessary easement documents <br />and the Director to execute said documents. The ~asement agreement shall require the grantee to <br />replace and reclaim all existing project features, ; <br /> <br />Flood Protection. Water Project Planning and Fihancing. Stream and Lake Protection <br />Water Supply Protection . Co~servation Planning <br /> <br />.e <br />
The URL can be used to link to this page
Your browser does not support the video tag.