My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00188
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00188
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:46:44 PM
Creation date
10/4/2006 6:32:56 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/14/1962
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />construction. He have reviewed and reinvesti- <br />gated the entire needs of the Trinidad area <br />with respect to irrigation, flood control, <br />water supply and recreation,pollution abate- <br />ment, and so forth, with a view to making this <br />project as comprehensive as possible. <br /> <br />I <br /> <br />\^Ie have reinvestigated the site. \tJe have <br />relocated a new site downstream, somewhat <br />below the original site. It has been drilled <br />out; the site has been approved by our Depart- <br />ment and by the state and I believe it is going <br />to be a very satisfactory water-tight site and <br />I think it will be very satisfactory to all <br />concerned. We have reinvestigated the flood <br />control requirements. We have increased the <br />storage requirements somewhat for flood con- <br />trol and the Bureau of Reclamation. as they <br />probably reported to you previously, have re- <br />investigated the needs for irrigation and <br />there has been some adjustment made in the <br />storage requirement for irrigation. <br /> <br />We have also reinvestigated the need for <br />recreation and fish and wildlife and find <br />there is a great need and have included a <br />permanent pool in this reservoir of 4500 acre- <br />feet. We think this is noteworthy and we are <br />very happy to report it. <br /> <br />Now we've wrapped all this up in a gen~ <br />eral overall definite project report which is <br />in the hands of our higher authority at this <br />time. We think we'll get approval on it and <br />we are proceeding with detailed designs on the <br />project. We hope to initiate the first incre- <br />ment of construction about March, 1964. That <br />will consist of the outlet works. Following <br />that we will, of course, do the embankment, <br />spillway, etc., and we intend, based on our <br />present schedule, to have the job completed <br />for operation in about June, 1965. <br /> <br />I <br /> <br />I believe that's about the most pertinent <br />things about the project. I might add that <br />we've had splendid cooperation from the Bureau <br />of Reclamation, the state agencies of Colorado, <br />
The URL can be used to link to this page
Your browser does not support the video tag.