My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00125
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:45:20 PM
Creation date
10/4/2006 6:31:58 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/23/1981
Description
CWCB Meeting
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(2) an appraisal level evaluatlon of the yield of the <br /> <br /> <br />subject water rights as developed by the various <br /> <br /> <br />dlternatives under consideration, <br /> <br />(3) an analysis of the potential uses, including on-site <br /> <br /> <br />recreation and hydropower generation, and places of use <br /> <br /> <br />(throughout the Colorado portion of the White River <br /> <br /> <br />Basin) of the water which could be developed from the <br /> <br /> <br />subject wat~r rights, <br /> <br />(4l preparation of appraisal level engineering designs and <br />cost estimates (including annual operation, <br />maintenance, and replacement costs), <br /> <br />(5) an appraisal level evaluation of the annualized costs <br />per acre-foot of water developed, <br /> <br />(6) an appraisal level evaluation of the revenues which <br /> <br /> <br />could be obtained from the sale of hydroelectric power, <br /> <br /> <br />and <br /> <br />(7) an analysis of the financial feasibility of the <br /> <br /> <br />project, to lnclude consideration of alternatlve <br /> <br /> <br />techniques for financing construction of the project. <br /> <br />The study shall not include an evaluation of the economic <br /> <br /> <br />feasibillty of the project (i.e., a cost-benefit analysis) nor <br /> <br /> <br />shail it include an evaluation of those recreational, <br /> <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.