Laserfiche WebLink
<br />1 <br /> <br />With these additional items we could attract men <br />to the vacant positions and proceed with some speed to <br />procure data with which to solve our problems. As matters <br />now stand, we have no expert on ground water on our staff <br />and are unable to attract engineers on account of our low <br />pay scale and excessive years of experience demanded to <br />qualify for that low pay. <br /> <br />(8). <br />because the situation demands more technical service. <br />would expect to h~ve the ground water hydrologist or <br />engineer or both assist me as the occasion requires. <br /> <br />I have not requested an assistant director <br /> <br />I <br />the <br /> <br />1 <br /> <br />584 <br />