My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00034
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:42:58 PM
Creation date
10/4/2006 6:31:04 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/23/2005
Description
CWCB Director's Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />was changed to a liner. A 400-ft section of the ditch lining project was completed in February of <br />2005. The Company has a remaining 800-ft section of ditch to line and a number of small concrete . <br />diversion structures to replace. Proj ect completion is scheduled for September of 2006. <br /> <br />72 Dolor"o W "tier rOTIO"rv"TIr,y Diotrict Dov" rr""k S"r,on<bry WM"r Sllpply Syot"m <br /> <br />Authorization: Construction Fund <br />Water Source: San JuanlDolores <br />Terms of Loan: $883,304@3.00% for 10-years <br /> <br />County: Dolores <br />Project Yield: 300 acre-feet <br />Project Type: Dual Water System <br /> <br />Residents of the Town of Dove Creek currently use existing treated water supply for <br />outside irrigation. DWCD has been working with the Town, and the Town's Secondary Water <br />Supply Committee, to provide a more cost effective raw water supply for outside irrigation. <br />Currently the cost of treated outside irrigation water for Town residents is $2.40 to $3.00 per <br />thousand gallons. Through a Franchise Agreement, DWCD will make available up 300 acre-feet <br />of its municipal and industrial (M & 1) water to meet the needs of the Town, and will construct <br />and operate a secondary water delivery system. The system will include a new pumping plant to <br />deliver up to 2 cfs, a 5 to 10 acre-foot tenninal storage reservoir, 32,000 feet of delivery pipeline <br />(10"-8660 feet, 8"-7480 feet, 6"- 16,480 feet) and 307 individual taps with water meters (% to 1- <br />inch capacity) for supplying up to 10 gallons per minute per household. With the new systems <br />outside irrigation can be provided at about $1.26 per 1000 gallons, including annual operation <br />and maintenance. The project will be paid for by tap fees, and a total of 307 taps are required to <br />generate enough revenue to fully repay the project cost. The project is being constructed in-kind <br />by the Dolores Water Conservancy District and is currently under construction. The project is . <br />anticipated to be complete by fall of2005. <br /> <br />71 T iffl" TI1ompoon/Centr"l Welrl W"t"rDi,tricts - Re,,,rvoir rOTI,trndion <br /> <br />Authorization: Severance Tax P6rpetualAcconnt- -CQunty:.Larimer.- <br />Water Source: South Platte .- - Project Yield: 5,200 acre~feet <br />Terms of Loan: $7,875,000 @4.05%for20-years Project Type: Reservoir Construction <br /> <br />The Little Thompson Water District and the Central Weld County Water Districts have a <br />SO/50 partnership to construct, own and operate a new reservoir (Dry Creek Reservoir). The <br />proposed project, located approximately 2 miles southeast of Carter Lake would include <br />construction of a 5,200 acre-foot reservoir, including a 40-foot high earthen dam with an emergency <br />spillway and outlet works. Construction will aiso include converting an existing 20-inch treated <br />line to a raw water delivery line that will connect from the Filter Plant at Carter Lake to the new <br />reservoir and the construction of a 5000 GPM pump station. This $10,500,000 project is currently <br />under design and in the process of obtaining necessary permits and approvals. Project construction <br />may be spring of 2005/06 depending on level of EP A requirements and approvals. Final design <br />plans were submitted to the SEO Office in January of2005 and is schedule for approval by June of <br />2005. <br />
The URL can be used to link to this page
Your browser does not support the video tag.