My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD00021
CWCB
>
Board Meetings
>
Backfile
>
1-1000
>
BOARD00021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:42:41 PM
Creation date
10/4/2006 6:30:49 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/12/1965
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'-J:.c.J~ <br /> <br />I <br /> <br />but remind us that in 1921 we had a devastat- <br />ing flood that did damage in Pueblo. The <br />recent event was related in large measure to <br />the tributaries downstream from Pueblo but <br />there was also a high flow into the river past <br />the Pueblo damsite. We have initiated work <br />on this site. 1'7e have begun to purchase land. <br />Ne are in the process of working out a railroad <br />relocation around the site and are prepared to <br />move forward with the construction of this dam <br />as soon as funds are provided for full scale <br />construction by the congress. Our construc- <br />tion program at the present time calls for com- <br />pletion of this facility in 1972. Now this <br />storage reservoir could be completed one to two <br />years sooner than this, depending upon the funds <br />that might be advanced by the Congress for <br />earlier than programed construction activities <br />there. To date the congress has not been <br />asked for money in advance of the 1972 comple- <br />tion date program. <br /> <br />We have under way some basin type studies <br />of the Lower Arkansas. These studies are under <br />the direction of our Pueblo office. We have <br />programed a very active study in this area <br />beginning in F. Y. 1967. If we are to accel- <br />erate this we would need funds in 1966 not now <br />in the program in the amount of about $30,000. <br /> <br />I <br /> <br />On the Purgatoire River we are wOrl{ing <br />diligently on the completion of the repayment <br />contract for the irrigation portion. of Trinidad <br />Reservoir. The floods that occurred in Trini- <br />dad just a couple of weeks ago were of great <br />magnitude and certainly point to the need for <br />early construction of Trinidad Reservoir. We <br />are prepared to do everything possible to speed <br />that up by the completion of a repayment con- <br />tract on the irrigation features. This is a <br />most complicated repayment negotiation and it <br />will be time-consuming at best. We will need <br />help from all concerned including staff members <br />of the Board to successfully complete the <br />study. <br /> <br />I think that the Board would be interested <br />
The URL can be used to link to this page
Your browser does not support the video tag.