Laserfiche WebLink
<br />DcCISIO~ AND PERMIT-Page Five <br /> <br />~\lY81-l <br /> <br />b. To four newspapers of the broadest circulation in the <br />project area, at least twice a month, the names of <br />those newspapers to be forward~d immediately to the <br />Executi.ve Director: ' <br /> <br />L. A SUffi:TI8!"y of form 14113 indicating on which days <br />and from which generators seeding occurred in the <br />pro;ect area and the intended resuts. <br /> <br />c. To the Colorado State Patrol and the Forest Service <br />Avalanche Forecast Center at least twice a month, <br />summarizing the project's activities and status. <br /> <br />d. To the Executive Director as specified in 3~-20-117(3) <br />a written final operational report and a written final <br />report, evaluating the project, or an annual <br />operational report and an annual project evaluation, <br />as the case may be. A finat operational report along <br />with a preliminary scientific evaluation of the <br />?roject shall be filed no later than thirty da1s after <br />the completion of the project. A final complete <br />scient~fic evaluatio~ of the project shall b~ filed no <br />later than one hundred eighty days after the <br />completion of the projecc. An annual summary report <br />shall be filed sixty days prior to the renewal of a <br />permit under the provisions of Section 36-20-114(2). <br />All such reports are declared to be public reco~ds <br />subject to the provisions and limitati.ons of part 2 of <br />article 72 of title 24. C.R.S. 1973. <br /> <br />7. The Applicant shall strictly follow the minimum guidelines for <br />coordination of this project with other State weather modification <br />projects: <br /> <br />8. The A?plicant shall communicate each day 'se<:!ding <br />occurs with the designated re?resentative of the <br />Depa.-tment ot Natural resources on all aspects of the <br />cloud seeding operations, including location, time, <br />and rate. Such notice may be communicated ::.y <br />telephone and Con finned in the reports referred to in <br />Paragraph 6 Supra. <br /> <br />b. The Applicant shall also communicate boeh before and <br />after cloud seeding operations with any other,operator <br />auchorized to modify the weather in the State during <br />the designated time'period. Said communications can <br />be made by tei~phone but shall be ~onfirmed in wricing. <br /> <br />c. The Applicant shall obtain current information about <br />cloud seeding programs in neighboring states that <br />might affect seeding rates and conditions of this <br />pro,%ram. <br /> <br />d. IndiRcr'minate seeding activities or overseeding may <br />be grounds for revocation of this permit. <br /> <br />e. Any disputes or conflicts re~arding this op-2rati'HI <br />with otheL operations within or outside Colorado shalL <br />be present2d to the Executive Di,ectOT fOe resolution. <br /> <br />Page Five <br />