Laserfiche WebLink
<br />'WY81-l <br /> <br />DECISION AND PF.RMIT-Page Four <br /> <br />The average snowpack will be calculated by averaging the <br />.actual Soil conservation.Service snowpack readings for water content. <br />from representativ~ snow measurement sites in the projected area. <br />The 'sites shall be selected'-by the E.xecuti.ve Diretor and the <br />Contractor. Monthly reports' from each snoW course listing che <br />current snowpack readings shall be forwarded to' the Executive <br />Director. The normal snowpack will be the average water content of." <br />the snowpack for the past 15 years of record for each of the <br />selected snow courses during January, February, and March. For ": <br />November or December, percent of average shall be calculated by the <br />soil Conservation Service Snow Survey Unit. The Snow Survey Unit <br />has offered to provide Snotel readings to the Department on request: <br /> <br />4. The Applicant shall also suspend. seeding operations where one or <br />more of the following occurrences take place,: <br /> <br />a. When weather forecasts or actual storms are producing <br />unusually heavy precipitation amounts that' could ' <br />possibly cont'ribute to avalancpes or severe we~ther <br />.. c'onditions in the project area. Guidance for ' <br />. avalanche 'and severe stormS are set forth in greater <br />detail in Attachment C which shall be adhered to DY <br />the perm~ttee. ' <br /> <br />b. When the United States Forest Service Rocky Mountain <br />Avalanche Forecast Center issues. the ~arnin'g naIl <br />travelers should use extreme caution'" in the project,. <br />area. <br /> <br />C. When the Executive Director ~pecifies that seeding <br />should be suspended. <br /> <br />.5. The Applicant shall consult with the U.S. Forest Service Rocky <br />Mountain Avalanche Forecast Center prior to seeding and inform the <br />Colorado State Highway Patrol (Denver Dispatch Office). when seeding. <br />occurs. <br /> <br />6. The Applicant shall submit reports on cloud seeding activity' <br /> <br />a. To the Executive Director; at. least twice.' month: . <br /> <br />1. Copies of form WM3-indicating all generator' '," <br />operations and the intended results and a summary <br />of the form specifically addressed, in part, to <br />the TERMS AND CONDITIONS of.this ~rmit. The <br />Executive Director shall forward said reports to <br />the State Weather t-iodificatiOn Advisory ,committee'.' <br /> <br />I <br />I <br />!I <br /> <br />,2. A copy of the daily Worksheet "Decision Summary <br />Notification Form on which seed/no seed decisions' <br />are based and the form indicating 'the parameter . <br />data information requested and utilized in making' <br />,avalanche suspension decisi,ons. . <br /> <br />," <br />,. <br /> <br />Page Four <br />