Laserfiche WebLink
<br />DECISION AND PERMIT-Page Four <br /> <br />WY 82-2 <br /> <br />b. When the United States Forest Service Rocky Mountain <br />Avalanche Forecast Center issues the warning "all <br />travelers should use extreme caution" in the project <br />area. <br /> <br />c. When the Executive Director specifies that seeding <br />should be suspended. <br /> <br />7. The Applicant shall consult with the U.S. Forest Service Rocky <br />Mountain Avalanche Forecast Center prior to seeding and inform the <br />Colorado State Highway Patrol (Oenver Dispatch Office) when seeding <br />occurs. <br /> <br />8. The Applicant shall submit reports on cloud seeding activities~ <br /> <br />t <br />I <br /> <br />a. To the Executive Director, at least twice a month: <br /> <br />1. Copies of form WM3-indicating all generator <br />operations and the intended results and a summary <br />of the form specifically addressed, in part. to <br />the TERMS ANO CONOITIONS of this permit. The <br />Executive Director shall forward said reports to <br />the State Weather Modification Advisory Committee. <br /> <br />2. A copy of the daily Worksheet Decision Summary <br />Notification Form on which seed/no seed decisions <br />are based and the form indicating the parameter <br />data information requested and utilized in making <br />avalanche suspension decisions. <br /> <br />b. <br /> <br />To four newspapers of the broadest circulation in the <br />project area at least twice a month, including the <br />Silverton Standard, the names of those newspapers to <br />be forwarded immediately to the Executive Director: a <br />summary of form WM3 indicating on which days and from <br />which generator locations seeding occurred in the <br />project area and the intended results. <br /> <br />c. <br /> <br />To the Colorado State Patrol and the Forest Service <br />Avalanche Forecast Center at least twice a month, <br />summarizing the project's activities and status. <br /> <br />d. <br /> <br />To the Executive Director as specified in 36-20-117(3) <br />a written final operational report and a written final <br />report, evaluating the project, or an annual <br />operational report and an annual project evaluation) <br />as the case may be. A final operational report along <br />with a preliminary scientific evaluation of the <br />project shall be filed no later than thirty days after <br />the completion of the ?roject. A final complete <br />scientific evaluation of the project shall be filed no <br />later than one hundred eighty days after the <br />completion of the project. An annual summary report <br />shall be filed sixty days prior to the renewal of a <br />permit under the provisions of section 36-20-114(2). <br />All such reports are declared to be public records <br />subject to the provisions and limitations of part 2 of <br />article 72 of title 24, C.R.S. 1973. <br /> <br />Page Four <br />