Laserfiche WebLink
<br />t <br />. <br />t <br />t <br />t <br />t <br />t <br />t <br />~ <br />. <br />. <br />. <br />. <br />. <br />I <br />I <br />I <br />I <br />. <br />. <br />. <br />I <br />I <br />I <br />I <br />I <br /> <br />2. Project-Specific Target and Control Area Considerations <br /> <br />The TarQet Area <br /> <br />Denver Water's region of interest. the target area for which the subject seeding <br />effects assessment technique has been developed, encompasses mountainous areas <br />above the 9,000' elevation, as shown in Figure 1. Although it is part of a larger seeding <br />project, only the Denver Water target area is shown. <br /> <br />~ <br />f-I--=-:{ '-. - -- <br />I ' ~F <br />'I l <br />. - <br /> <br /> <br />I <br />he~e <br /> <br />'0 <br /> <br />( <br /> <br />I <br />"" , <br /> <br />e.Jd'l: <br /> <br />L_ <br /> <br /> <br />, <br /> <br />Figure 1. Area map showing Denver Water target area <br /> <br />Base Period Determination <br /> <br />The first step in developing a targeUcontrol regression analysis is to establish a <br />ma1hernatical relationship between the target and control areas during a collection of <br />not-seeded historic peri(Kts. Ideally, this historic base period will encompass twenty or <br /> <br />4 <br />