Laserfiche WebLink
<br />I <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />~IlLlTARY PARK RESERVOIR REHABlLlTATlO:\' <br /> <br /> <br />~1ilitar:y Park Resen'oir Breached Dam <br /> <br />Proiect Description <br /> <br />The project consisted of the replacement of the earth till dams outlet works including a precast <br />outlet structure. l~" PVC outlet pipe and reinstalled gate assembly. The dam was breached in <br />late 1994 for the necessary construction and not completed until mid-October 1995 due to <br />lingering snowpack on the Grand :'-.Iesa. <br /> <br />Proiect Data <br /> <br />Sponsor: ~Iilitary Park Reservoir Co. <br /> <br />Coun~': Delta <br /> <br />Rin"r: OtT-Stream Grand \1esa <br /> <br />Terms of Loan: 530.000 'E .to ~'O for 30 years Subst..ntial Completion: Oct. 15. 1995 <br /> <br />Design Engineer: Ed Currier. P.E. - Grand Junction. Colorado <br /> <br />Construction Contractor: Colorado \\"est Contracting. Inc. . Grand Junction. Colorado <br /> <br />Dcsi~n Criteria: <br /> <br />1: inch PVC outlet pipe <br />1.200 cu. yd. of embankment material <br /> <br />Annual \.olume of Waler Remond from Rc~triction b~ the Project: 232 acre.feet <br />