Laserfiche WebLink
<br />I <br />I <br /> <br />Kl:\GSROW HO~IEOW:\ER'S ASSOCIATlO:\ OUTSIDE IRRIG.HIO:\ SYSTDI <br /> <br />I <br /> <br /> <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br /> <br />Kingsro" HomeD" neT'S DiHrsion StructureIDi,:ision Box <br /> <br />Proiect OescriDtion <br /> <br />I <br /> <br />This underground irrigation system for a subdivision of homes near Carbondale was <br />completed by Evergreen Sprinkler Co. of Carbondale. Colorado September I. 1995. The <br />schedule was delayed several months due' to the unavailability of the special "rock saw" used in <br />cuning the pipeline trenches. The project is a metered system allowing all excess \\:ater not used <br />by the irrigation system [0 be di,"ened for dO\\TIstream use. <br /> <br />I <br />I <br />I <br /> <br />Proiect Data <br /> <br />Sponsor: Kings Row HomcO\mers Assoc. Coun~': Gartield <br /> <br />Source: Spring Park Reservoir <br /> <br />Terms of Loan: S75.000'~ 4.75% for ~O years Substantial Completion: Sept. 1. 1995. <br /> <br />Design Engineer: Satural Resource Conserv::J.tion Service' - Glenwood Springs Office'. <br /> <br />Construction Contractor: bergrec:n Sprinkler Company - Carbondale. Colorado <br /> <br />Design Criteria: <br /> <br />14.000 ft. of P\'C pip< from 2" to 8" <br />49 Homeowner T ::J.pS <br /> <br />Annual Volume of Water Delinred by the Project: 80 ac.ft <br />