My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00129
CWCB
>
Publications
>
Backfile
>
PUB00129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2010 3:55:22 PM
Creation date
9/30/2006 10:21:49 PM
Metadata
Fields
Template:
Publications
Year
1980
Title
Construction Fund Annual Report 1980
CWCB Section
Finance
Author
CWCB
Description
Construction Fund Annual Report 1980
Publications - Doc Type
CF Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />.~ <br /> <br />,,7' <br /> <br />COLORADO WATER CONSERV.ATION aOARD <br />823 state centerinialBuilding <br />1313 Sherman Street <br />Denver, Colorado 80203 <br /> <br />Decemb~r,1979 <br /> <br />RANGELY PROJECT <br /> <br />INTRODUCTION <br /> <br />The Rangely project was originally authorized by the Colorado <br />legislature in 1975. An amount of $600,000 was subsequently made <br /> <br />available from oil shale lease trust funds, and projectconstruc- <br /> <br />tion was started in 1977. <br /> <br />PRoaLEM <br /> <br />When the project was completed in 1978 and the system was put <br /> <br />in operation, certain deficiencies became apparent. The town <br /> <br />manager then requested the help of the Colorado Water Conservation <br /> <br />aoard staff to advise him as to how to eliminate the problems. <br /> <br />The staff subsequently requested the engineering firm of Wright- <br /> <br />McLaughlin Engineers to evaluate the constructed project and to <br />define needed modifications or improvements to correct the <br /> <br />deficiencies. <br /> <br />CUR!<~NT STATUS <br />The request for help to the aoard staff was repeated when the <br />new town manager was appointed in September, 1979. <br />Meanwhile, the consulting engineers of Meurer, Serafini, and <br />Meurer, Inc., "'''>.0 designed and supervised the' building of the <br />project, have sued the town for not paying the engineering fees <br />provided for in the contract. <br /> <br />PROPOSED PROJECT <br /> <br />The improvements to the project, as proposed by Wright- <br /> <br />;/.-"- <br /> <br />. . <br />. _ ''"' _, - , _ _ ,c. _ ,,,_ _ _ _ ' _ ~ _ _ <br />,: " 'i; ,,_:_.,',:~-"~~Si;_~;;j~L~:",:J.;~~'~ _:~_c.;-i-;~ki~~~~L~:i-:~lL~_;~lj;~~~;,;i;l\~_i~j~;"jli~i';:;~~~~~~~l- ~~~t~~~~;i~~~~i~;~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.