Laserfiche WebLink
<br />. <br /> <br />MEEKER WATER FACILITIES IMPROVEMENT PROJECT <br />ESTIMATED PROJECT COST - SELECTED PLAN <br /> <br />1. Water Transmission Pipeline, 18", 28,350 1.f. <br />@ $24/l.f. <br /> <br />2. Ground Water Supply Facilities (4 wells) <br /> <br />Test Holes <br /> <br />$ 10,000 <br /> <br />Wells, Drilling, Construction, <br />Development <br /> <br />32,000 <br />24,000 <br /> <br />Well Pumps <br /> <br />Well Flowlines, Valving and <br />Connections <br /> <br />18,500 <br /> <br />3. Central Chlorianation Metering and <br />Pumping Facility w/controls <br /> <br />4. Water Transmission Pipeline, 12", 13,000 l.f. <br />@ $16/l.f. <br /> <br />5. Water Treatment Plant Facilities <br /> <br />Intake Structure <br /> <br />$ 50,000 <br /> <br />Flowline, 15", 1,250 l.f. <br />@ $20/1. f . <br /> <br />25,000 <br /> <br />Water Treatment Plan, 1.6 MGD <br />w/controls and backwash treatment 565.000 <br /> <br />6. Insulate and Frostproof Existing Storage Tanks <br />7. Zone 2 Facilities <br /> <br />Booster Pump Station <br /> <br />Pressure Reducing Station <br /> <br />Transmission Pipeline, 3,600 l.f. <br />@ $16/l.f. <br /> <br />$ 40,000 <br />21,000 <br /> <br />Storage Tank <br /> <br />58,000 <br />142,000 <br /> <br />. <br /> <br />-8- <br /> <br />$ 680,500 <br /> <br />84,500 <br /> <br />115,000 <br /> <br />208,000 <br /> <br />640,000 <br />42,000 <br /> <br />261,000 <br />